This standard specifies the integrated process of tests for thermal performance, noise and water flow rate of drift loss of industrial circulating water wet cooling tower. It also specifies the measuring methods for parameters, processing method of test data, and the assessment method for test results.
This standard is applicable to the acceptance test for newly-built or renovated wet type industrial circulating water cooling tower with mechanical draft and natural draft. It also can be applied to non-acceptance test for cooling tower.
This standard is not applicable to the acceptance tests for cooling-chimney combined tower, and cooling towers.