1 Scope
This standard specifies the basic technical requirements of fossil fuel power plant, power substation and the auxiliary facilities engineering survey.
This standard is applicable to the engineering survey at the design stage, construction stage and completion stage of fossil fuel power plant, power substation and the auxiliary facilities (including construction, renovation and extension). Engineering survey at the operation stage may make reference to this standard.
2 Normative References
The following standards contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding correction to), or revisions of, any of these publications do not apply. However, the parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards. For undated references, the latest edition of the normative document referred to applies.
GB 12897 Specifications for the first and second order leveling
GB 12898 Specifications for the third and fourth order leveling
GB 14804 Classification and codes for features of 1:500, 1:1000 and 1:2000 topographic maps
GB 50026 Code for Engineering Surveying
GB/T 7929 Classification and codes for features of 1:500, 1:1000 and 1:2000 topographic maps
GB/T 5791 Specification for cartographic symbols-1:5000 & 1:10000 topographic maps
GB/T 13923 Classify and codes for the national land information
GB/T 16819-1997 Planetabling specifications for 1:500, 1:1000, 1:2000 topographic maps
GB/T 17160-1997 Specifications for digitizing 1:500,1:1 000 and 1:2 000 topographic maps
GB/T 17942 Specifications for national triangulation
GB/T 18314 Specifications for global positioning system (GPS) surveys
GB/T 18316 Specifications for inspection, acceptance and quality assessment of digital surveying and mapping products
GH/T 2002 Electronic data recording rules for traverses
CH/T 2004 The general rules of the electronic data recording for field surveying
CH/T 2005 The electronic data recording rules for triangulation
CH/T 2006 The electronic data recording rules for leveling
3 General Provisions
3.0.1 This standard is formulated with a view to standardizing the technical standards of fossil fuel power plant, power substation and the auxiliary facilities engineering survey, timely applying advanced surveying and mapping technologies, submitting qualified surveying and mapping results, and adapting to the requirements of electric power construction development.
3.0.2 In this code, the root mean square error is taken as the standard to judge the precision, and the value of double root mean square error is taken as the limit error.
3.0.3 Instruments of surveying and mapping shall be inspected and corrected periodically, preserved and maintained to be in the good state. Instruments and tools of surveying and mapping for operation shall be viewed before operation, and the viewing records shall be submitted as the source materials.
3.0.4 Basic scale of mapping at the design stage shall be in accordance with those specified in Table 3.04.