n of single project, quality evolution of single unit, and quality evolution of overall project of boiler unit in thermal power generation engineering.
This Part is applicable to the construction quality acceptance and evaluation for new, extended rebuilt thermal power boiler unit with the unit capacity 300MW~1000MW. the construction quality acceptance evaluation for thermal power boiler unit with unit capacity under 300MW~1000 MW may comply with this part by reference (the contents on waste incineration boiler, biomass incineration boiler and combustion engine exhaust-heat boiler are detailed in Annex A, Annex B and Annex.
2 Normative references
The following normative documents contain provision which, through reference in this text, constitute provisions of this Part. Subsequent amendments (excluding correction to) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this Part are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest editions of the normative documents are applicable to this part.
GB 1231-2006 Specifications of High Strength Bolts with Large Hexagon Head, Large Hexagon Nuts, Plain Washers for Steel Structures
GB 3632-2008 Sets of Torshear Type High Strength Bolt Hexagon Nut and Plain Washer for Steel Structures
50205-2001 Code for Acceptance of Construction Quality of Steel Structures
GB/T 50375-2006 Evaluating standard for excellent quality of building engineering
GB 8918-2006 Steel wire ropes for important purposes
DL 612-1996 Supervision code for boiler and pressure vessel of the power industry
DL 647-2004 Inspection code for boiler and pressure vessel in thermal power plant
DL/T 776-2001 Technical requirements for insulation material of thermal power plants
DL/T 777-2001 Technical requirements for boiler refractory of thermal power plants
DL/T 869-2004 The code of welding for power plant
DL/T 902-2004 Technical requirements and test methods of abrasion resistant refractory material
DL 5000-2000 Technical Code for Designing Fossil Fuel Power Plants
DL 5009.1-2002 Code of safety operation in power engineering construction Part 1: Thermal Power Plant
DL 5011-1992 The Code of Election and Acceptance for Power Plant Construction - steam turbine unit part
DL 5031-1994 The Code of Election and Acceptance for Power Plant Construction - Piping Part
DL/T 5047-1995 The Code of Election and Acceptance for Power Plant Construction - Boiler Unit Part
DL/T 5161-2002 Electric Equipment Installation Engineering
DL/T 5190.4-2004 The Code of Election and Acceptance for Power Plant Construction - Part 4: Chemistry for fossil fuel power plant
JGJ 82-91 specifications on design and construction and acceptance of high strength bolts for steel structure
T SG R0004-2009: Supervision Regulation on Safety Technology for Stationary Pressure Vessel
3 General Provisions
3.0.1 This standard is formulated with a view to intensifying construction engineering quality control in electric power industry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering.
3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by inspection lot, subitem project, subsection project, and unit project. the construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with Article 4.1.12 in this Part.
3.0.3 The engineering quality evaluation shall be conducted for the projects with the "high quality" engineering objective.
3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - single project, single unit and overall project.
3.0.5 The construction quality evaluation for single project shall be conducted upon that the construction quality acceptance for all unit projects is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial operation with full load.
3.0.6 The quality evolution for single unit shall be con ducted after the construction quality acceptance for all single projects and the 168-h trial operation of the unit with full load are completed and the environmental protection projects supported are normally put into operation. the synergic system shall be bought into the evaluation for the first unit.
3.0.7 The quality evolution for overall project shall be conducted after the quality evolution for all single units, the performance tests of the units and the engineering archives evaluation are completed.