DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation
Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation
This standard specifies the relevant requirements in construction quality acceptance standard, quality evaluation of single project, quality evaluation of single unit, and quality evaluation of overall project of the equipment and the system with the water treatment and hydrogen generation in thermal power generation project.
This standard is applicable to construction quality acceptance and engineering quality assessment of new construction, extension and renovation of equipment and system with the water treatment and hydrogen generation in thermal power generation project with unit capacity of 300MW ~ 1000MW. This standard can be referenced for construction quality acceptance and engineering quality assessment of thermal power generation project and nuclear power station conventional island under 300MW and the BOP equipment and system with the water treatment and hydrogen generation.
2 Normative References
The following documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding corrigenda), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of these documents is applicable. For undated references, the latest edition of the normative document is applicable to this standard.
GB 150 Steel pressure vessels
GB 18241.1 Rubber lining--Part 1 Anticorrosion lining for equipment
GB 50177 Design code for hydrogen station
GB 50212 Specification for construction and acceptance of anticorrosive engineering of buildings
GB/T 3511 Rubber vulcanized or thermoplastic - Resistance to weathering
GB/T 50375 Evaluating standard for excellent quality of building engineering
DL 5031 The Code of Election and Acceptance for Power Plant Construction - Piping Part
DL/T 869 The Code of the Welding for Power Plant
DL/T 935 Pipes and fittings of steel lined with plastics
DL/T 5068 Technical code for designing chemistry of fossil fuel power plants
DL/T 5190.4 The code of election and acceptance for power plant construction - Part 4: Chemistry for fossil fuel power plant
DL/T 5210.1 Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering
DL/T 5210.2 Specification for construction quality acceptance and evaluation of electric power construct Part 2: Boiler unit
DL/T 5210.3 Specification for construction quality acceptance and evaluation of electric power construct Part 2: Steam turbine generator units
DL/T 5210.5 Specification for construction quality acceptance and evaluation of electric power construct Part 5: Piping & system
DL/T 5210.8 Specification for construction quality acceptance and evaluation of electric power construct Part 8: Processing preparation
HG/T 3831 Spray polyurea for materials protection
3 General Provisions
3.0.1 This standard is formulated with a view to intensifying construction engineering quality control in electric power industry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering.
3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by inspection lot, subitem project, subsection project, and unit project. The construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with Article 4.1.12 in this standard.
3.0.3 The engineering quality evaluation shall be conducted for the projects with the "high quality" engineering objective.
3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - single project, single unit and overall project.
3.0.5 The construction quality evaluation for single project shall be conducted upon that the construction quality acceptance for all unit projects is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial operation with full load.
3.0.6 The quality evaluation for single unit shall be conducted after the construction quality acceptance for all single projects and the 168-h trial operation of the unit with full load are completed and the environmental protection projects supported are normally put into operation. The synergic system shall be bought into the evaluation for the first unit.
3.0.7 The quality evaluation for overall project shall be conducted after the quality evaluation for all single units, the performance tests of the units and the engineering archives evaluation are completed.
DL/T 5210.6-2009 The following standards are cited:
DL/T 5210.6-2009 Cited by the following standards: