1.0.1 So as to instruct chemical machinery installation engineering and improve construction level as well as guarantee quality and safety, the specification is worked out.
1.0.2 The specification is suitable for chemical industry machinery installation construction, solo test run and acceptance of compressor, fan, chemical pump, centrifuge, beater, filter, drier, refrigerating machine for chemical manufacturing.
1.0.3 The chemical machine linkage trial run, production preparation, chemical industry charging and manufacturing check are carried out by construction organization according to current standard HGJ 231 “Code for commissioning test run of chemical large and medium plant" and HGJ 232 "Code for preliminary work of production of chemical large and medium plant pipeline".
1.0.4 In the construction process, all classes of chemical machines not only implemented the specification specified basic technical requirements, but also implemented prescription of current special chemical machine construction and acceptance specification (hereinafter referred to as "special specification" and machine technical document.
1.0.5 The special engineering concerning piping, electric, instrument, corrosion protection, heat preservation and degreasing should be constructed and accepted according to design technical documents and related current standard and specification.
1.0.6 The safety technique, labor protection, environmental protection and fire protection requirements in chemical machine installation engineering should be implemented according to related prescription of current standard and specification.
1.0.7 The applied system of units of measurement and counting device, apparatus, instrument and equipment of machine installation must be implemented the prescription of current weights and measures law, and their precision class should be no less than the precision class of the detected objects.