1.0.1 The Specifications are prepared with a view to adapting to the demand of civil airport construction and ensuring the engineering quality of earthwork (rockwork) and pavement foundation for airfield area of civil airports in china.
1.0.2 The Specifications specify the technical requirements, quality standards, inspection frequency and methods for earthwork (rockwork) and pavement foundation. Technical requirements and standards for treatment of high fill and special unsurfaced subgrade are not specified in the Specifications.
1.0.3 The specifications are applicable to the airport road engineering in airfield area of newly-built, extended and rebuilt civil airports (including the civil parts of civil and military airports), and serve as the criterion for the construction and quality inspection of earthwork (rockwork) and foundation for airfield area.
1.0.4 The construction organization shall set a site laboratory to inspect the construction quality of earthwork (rockwork) and foundation.
1.0.5 For the construction of earthwork (rockwork) and foundation for airfield area of civil airports, in addition to those specified in the Specification, those specified in the current relevant mandatory specifications of the nations shall also be complied with.
2 Terms
2.0.1 Unsurfaced subgrade
The soil base course, under the base course of pavement or runaway shoulder, that meets the design requirements after rolling, compaction, uniformization and stabilization according to technical requirements or special treatment.
2.0.2 Base course
The structural course set below the pavement or runway shoulder surface course, mainly bearing the aircraft load transferred from surface course and distributing it on the unsurfaced subgrade. Where multi-layer base course is adopted, the undermost layer is referred to sub-base course.
2.0.3 Stabilized soil base course
The base course constructed with binders like lime, cement and fly ash as well as aggregates like soil and sand gravel through mixing, paving and compaction.
2.0.4 Graded aggregate base
The base course constructed with rubble or gravel matched according to dense gradation principle as aggregate and proper amount of fine grained soil through mixing, paving and compaction.
2.0.5 Bed course
The structural course below the base course, mainly used for water insulation, drainage, anti-freezing etc., so as to improve working conditions of base course and unsurfaced subgrade.
2.0.6 Fine grained soil
The soil with the maximum grain size less than 9.5mm and the content of grains less than 2.36mm not less than 90%.
2.0.7 Medum grained soil
The soil with the maximum grain size less than 26.5mm and the content of grains less than 19mm not less than 90%.
2.0.8 Coarse grained soil
The soil with the maximum grain size less than 37.5mm and the content of grains less than 31.5mm not less than 90%.
2.0.9 Coefficient of uniformity of soil
The ratio of the sieve mesh size with the throughput of 60% to that with throughput of 10% during sieving of soil grain composition.
2.0.10 Soil surfaced area
The soil surface requiring for flattening and rolling within the airfield area, including runway end safety area, runway strip flattening area and other soil surface requiring for flattening and rolling.
3 Construction Preparation
3.1 General Requirements
3.1.1 The construction organization shall comprehensively get familiar with the relevant information like construction drawings, technical requirements and construction specifications, deeply learn about construction site and its surrounding topography, geology, hydrology, meteorology, water source, power supply, transportation, communication contact, irrigation and water conservancy facilities and environmental protection conditions.
3.1.2 Prior to commencement of airport rebuilt (extended) engineering, the development organization shall submit the positions, directions, embedded depths and structures of various underground cable, pipe network and relevant facilities on construction site to the construction organization. For the original ground and underground buildings and structures and various pipe networks proposed to be reserved, e.g. communication, power supply, water supply, heating, air supply, oil supply, gas and various drainage pipe trenches, distinctive mark shall be provided and specific personnel protection shall be provided during the construction. The communication and electric power facilities as well as other buildings and structures shall be completed prior to commencement.
During construction, where the information provided by the development organization is found to be inconsistent with the reality or unforeseen circumstances occur, the construction organization and Supervising Engineer shall timely inform the development organization to jointly research and take measures.
3.1.3 The development organization shall organize the design, supervision, construction and other organizations to carry out design technique disclosure.
3.1.4 The construction organization shall seriously carry out construction organization design, submit it to the Supervising Engineer or development organization for approval and propose the commencement report. Construction network plan shall be prepared for important projects. The general construction layout drawing is an important constituent part of construction organization design, and shall meet the following requirements:
1 Site topography and surface features are comprehensively considered to realize reasonable layout and be convenient for construction.
2 Facilities of each temporary engineering shall be combined with permanent engineering as possible.
3 Temporary drainage and flood defense facilities shall be completed before flood season.
3.1.5 The construction organization shall carry out construction technique disclosure of construction drawings, construction organization design, engineering construction characteristics, quality standards, construction period requirements etc. to construction personnel concerned level-by-level.
3.1.6 Test section shall be constructed in regions with strict technical requirements, high topography and complex geology or for the engineering adopting new technique, new process and new material; technical assurance measures shall be taken and then site construction is carried out.
3.1.7 The construction organization shall carry out site layout according to the
MH 5014-2002 — Standards cited
MH 5014-2002 — Cited by
Use of cookies on this website:
We use strictly necessary cookies to make our site work. We would also like to set optional analytics cookies
to help us improve it, and targeting cookies. We won't set optional cookies unless you enable them.
For more detailed information about the cookies we use, see our
Cookies Notice.
By clicking "Accept all cookies", you agree to the storing of cookies on your device for the purposes set out
in our Cookies Notice. Click "Reject non-essential" to refuse optional cookies.
Strictly necessary cookies are always active and cannot be disabled.
Cookie Consent Manager
Your Privacy
Websites may store or retrieve information on your browser, mostly in the form of cookies.
This information might be about you, your preferences, or your device and is mostly used to make
the site work as you expect it to. The information does not usually directly identify you, but it
can give you a more personalized web experience. Because we respect your right to privacy, you can
choose not to allow some types of cookies. Click on the different category headings to find out more
and change our default settings. However, blocking some types of cookies may impact your experience
of the site and the services we are able to offer.
These cookies are required for the operation of our website and use of its features, and therefore
cannot be switched off in our systems. They are usually only set in response to actions made by you
which amount to a request for services, such as setting your privacy preferences, logging in, or
filling in forms.
Functional Cookies
These cookies are optional and are used to remember the choices you have made.
These cookies are optional and are used to collect information on how visitors use our website.
Targeting Cookies
These cookies may be set to deliver advertising that is more relevant to you and your interests,
or to measure advertising effectiveness. California residents may opt out of the sale or sharing
of personal information via Do Not Sell/Share.
If this site does not currently run advertising pixels, enabling this category has no effect until such tools are added.