Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 20471-2006 |
Condition monitoring and diagnostics of machines - General guidelines on using performance parameters |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 19873.1-2005 |
Condition monitoring and diagnostics of machines—Vibration condition monitoring—Part 1:General procedures |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 13437-2009 |
Description of torsional vibration absorber characteristics |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 29715-2013 |
Mechanical vibration and shock—Guidelines for dynamic tests and investigations on bridges and viaducts |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 25742.1-2010 |
Condition monitoring and diagnostics of machines - Data processing communication and presentation - Part 1: General guidelines |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 7183-1987 |
Evaluation of mechanical vibration severity of machines and equipments in electric locomotives |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 20485.41-2015 |
Methods for the calibration of vibration and shock transducers—Part 41:Calibration of laser vibrometers |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 13436-2008 |
Technical requirements for torsional vibration measuring instrument |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 7094-1986 |
Vibration test of electrical installation in ships |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 30173.2-2014 |
Mechanical vibration and shock—Resilient mounting systems—Part 2:Technical information to be exchanged for the application of vibration isolation associated with railway systems |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 13823.17-1996 |
Methods for the calibration of vibration and shock pick-ups Testing of acoustic sensitivity |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 11348.2-1997 |
Mechanical vibration of non-reciprocating machines--Measurements on rotating shafts and evaluation criteria--Part 2: Large land-based steam turbine generator sets |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 6383-1986 |
The method of vibration cavitation erosion test |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 10179-2009 |
Servo-hydraulic test equipment for generating vibration - Method of describing characteristics |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 14123-1993 |
Characteristics description for shock testing machines |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 22394-2008 |
Condition monitoring and diagnostics of machines - General guidelines on data interpretation and diagnostics techniques |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
JB/T 7914-1999 |
Auxiliary tables for vibration generators - Methods of describing equipment characteristics |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 15371-1994 |
Torsional vibration of crankshaft systems-Measurement and evaluation method |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 13823.10-1995 |
Methods for the calibration of vibration and shock pick-ups Secondary shock calibration |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 4451-1984 |
Methods of vibration(sinusoidal) test for use in industrial process measurement and control instrument |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|