Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 4106-2005 |
Technical standard of non-solvent polyurethane Internal and external coating for pipeline |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 0470-2000 |
Standard for construction and acceptance of oil and gas pipeline overhead crossing project |
885 (USD) |
via email in
1-8 business day
|
|
|
SY 0402-2000 |
Standard for construction and acceptance of oil and natural gas station procedure pipeline project |
870 (USD) |
via email in
1-8 business day
|
|
|
GB 8714-1988 |
Grey cast iron pipes with rubber ring of ladder-lip-shaped |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 4114-2008 |
|
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YB 4103-2000 |
Welded steel tubes for heat-exchanger |
90 (USD) |
via email in
1-3 business day
|
|
|
SY 0401-1998 |
Standard for consyruction and acceptance of oil and natural gas pipeline project |
570 (USD) |
via email in
1-5 business day
|
|
|
JG/T 3030-1995 |
Welded stainless steel tubes for architectural decoration |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG/T 225-2020 |
|
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
YB/T 176-2000 |
Ceramic-lined steel composite pipe |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 4105-2005 |
Technical standard of non-solvent polyurethane internal coating for steel container |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YB/T 171-2000 |
Special shaped steel tubes |
840 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB 9948-2006 |
Seamless steel tubes for petroleum cracking |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0429-2000 |
Standard for quality inspection and evaluation of petroleum construction engineering oil and natural gas pipeline project |
1650 (USD) |
via email in
1-10 business day
|
|
|
SY 0324-2001 |
Specification of construction and acceptance of heat insulation for buried high temperature steel pipeline |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
YB/T 4179-2008 |
Water-cooled metallic tube mould for centrifugal ductile iron pipe |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4208-2008 |
Code for quality acceptance of oil and gas construction engineering oil and gas transmission pipeline project |
915 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB 3422-1982 |
Cast-iron pressure pipe made by continuous casting process |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5768-2006 |
Welded steel pipe for normal structure purposes |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JG/T 3013-1994 |
Metal spiral sheath for prestressee concrete |
150 (USD) |
via email in
1-3 business day
|
|
|
|