Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 28472.1-2012 |
Distributor for use in industrial-process measure and control systems—Part 1:General technical specification |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16656.507-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 507:Application interpreted construct:Geometrically bounded surface |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 36245-2018 |
Guide for reliability allocation of industrial process measurement and control instrument |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 4830-2015 |
Industrial process measurement and control instruments—Pressure range and quality of air supply |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 19662-2005 |
Industrial automation systems-Manufacturing Message Specification-Terminology |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 16656.101-2010 |
Industrial automation systems and integration - Product data representation and exchange - Part 101: Integrated application resources: Draughting |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 16656.42-2010 |
Industrial automation systems and integration -Product data representation and exchange -Part 42: Integrated generic resource: Geometric and topological representation |
(USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 21099.3-2018 |
Function block(FB) for process control—Part 3:Electronic device description language(EDDL) |
(USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 592-2010 |
Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 28473.2-2012 |
Temperature transmitters for use in industrial-process measure and control systems—Part 2:Methods of evaluating the performance |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18975.2-2008 |
Industrial automation systems and integration - Integration of life-cycle data for process plants including oil and gas production facilities - Part 2: Data model |
(USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 16656.47-2008 |
Industrial automation systems and integration - Product data representation and exchange - Part 47: Iintergrated generic resources: Shape variation tolerances |
(USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 22112-2008 |
Industrial process measurement and control instruments - Arrangement and marking of connecting terminals |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 27758.3-2017 |
Industrial automation systems and integration—Diagnostics,capability assessment and maintenance applications integration—Part 3:Applications integration description method |
(USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 38620-2020 |
Methods of evaluating the performance of ultrasonic levelmeter |
(USD) |
via email in
1-3 business day
|
TO BE VALID
|
|
GB/T 28475.1-2012 |
Microprocessor control equipment in industrial stove—Part 1:General specification |
(USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 6875-2014 |
XCZ type moving-coil indicators for industrial-process measurement and control systems |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18268.1-2010 |
Electrical equipment for measurement,control and laboratory use—EMC requirements—Part 1:General requirements |
(USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20573-1995 |
Code for Distributed Control System Engineering Design |
(USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
HG/T 20636.7-1998 |
Produce for engineering design of instrumentation |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|