Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JG/T 496-2016 |
Specification of franklinism powder spraying coating for windows and doors of profiled aluminium alloy |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 0326-2002 |
Technical standard of the lining of glass fibre reinforced plastic of epoxy resin for steel tank |
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 0413-2002 |
Technical standard of polyethene coating for buried steel pipeline |
945 (USD) |
via email in
1-8 business day
|
|
|
GB/T 17459-1998 |
Ductile iron pipes--Bitumen coating |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
JG/T 495-2016 |
Specification of franklinism powder spraying coating for steel windows and doors |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 4107-2005 |
Standard test methods for measurement of dry film thickness of mult-coating system by destructive means |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18593-2010 |
Anti-corrosive painting of fusion bonded epoxy coating powders |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 28699-2012 |
Steel structure protection general requirements of coatings |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
JT/T 712-2008 |
Pavement antiskid paint |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18593-2001 |
Anti-corrosive painting of fusion bonded epoxy coating powders |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 24596-2009 |
Ductile iron pipes and fittings—Polyurethane coatings |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 31361-2015 |
Anti-corrosion painting of solvent-free liquid epoxy coating |
250 (USD) |
via email in
1 business day
|
VALID
|
|
JB/T 10394.3-2002 |
General technical conditions for painting equipment Part 3:Coating |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
|