Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 819-2002 |
The code of the welding heat treatment for power plant |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5503-2015 |
Regulations for content and depth of detail design of HVDC converter station |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1035.2-2006 |
Guidelines for the Maintenance of Circulating Fluidized Bed Boilers Part2: The maintenance of boiler body |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 421-2009 |
Determination of volume resistivity of power oils |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5161.17-2002 |
Specification for construction quality checkout and evaluation of electric equipment installation Part 17:Electric lighting device |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5130-2001 |
Technical regulation for design of steel transmission pole |
(USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 440-2004 |
The code of inspection and evaluation for existing boiler drum in fossil-fuel power plants |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 527-2002 |
Technical condition for power supply at static state protection equipment |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 478-2001 |
General specifications for static protection, security and automatic equipment |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 848.2-2004 |
General technical specification of high voltage test devices Part 2: Power frequency high voltage test device |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 665-2009 |
Inspection guide for water and steam integrated sampling and on-line analysing unit |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5175-2003 |
Technical rule for designing thermodynamic control system of fossil fuel power plants |
(USD) |
via email in
1-5 business day
|
VALID
|
|
DL/Z 790.11-2001 |
Distribution automation using distribution line carrier systems- Part 1: General considerations -Section 1: Distribution automation system architecture |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 905-2004 |
Technical guide for repair welding of turbine blades |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 763-2001 |
Technical requirements for overhead line helical fittings |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 899-2004 |
Loading tests on tower and pole structures of overhead line |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5158-2002 |
Technical code of meteorological surveying for electrical power projects |
(USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 848.3-2004 |
General technical specification of high voltage test devices Part 3: Non partial discharge testing transformer |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5153-2002 |
Technical rule for designing auxiliary power system of fossil fuel power plants |
(USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
JGJ 16-2008 |
Code for electrical design of civil buildings |
(USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
|