Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 7595-2017 |
Quality of transformer oils in service |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5187.2-2004 |
Technical code for designing coal handling of fossil fuel power plant Part 2:Dust prevention and control |
(USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 857-2004 |
Specification of rectification inversion equipment for battery of power plant and substation |
(USD) |
via email in
1-3 business day
|
VALID
|
|
T/CEC 141-2017 |
Installation and acceptance specification for on-line monitoring device of gases dissolved in transformer oil |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 555-2004 |
Guide for withstand voltage and insulated test of gas-insulated metal-enclosure switchgear on site |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1042-2007 |
Determination of octaamine in water |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 924-2005 |
Specification for supervisory information system for plant level of fossil fuel power plant |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 908-2004 |
Analysis of water and steam used in power plant -- Determination of sodium Second derivative flame emission spectrum method |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5205-2011 |
Code of valuation with bill quantity of electric power construction works Transmission line works |
(USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1125-2009 |
Insulating clothes for live working on 10KV lines |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 519-2004 |
Acceptance criterion for ion exchange resins used in water treatment in fossil-fired power plants |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 941-2005 |
Quality standard for sulphur hexafluoride of transformer in service |
(USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 17627.1-1998 |
High-voltage test techniques for low-voltage equipment Part 1: Definitions,test and procedure requirements |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 986-2005 |
The wet FGD processing property detection technical regulation |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 34578-2017 |
|
(USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 5217-2005 |
Technical code for design of 220kV~500kV compact overhead transmission line |
(USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 502.32-2006 |
Analytical methods of steam and water in power plants Part 32: Determination of calcium (Volumetric method) |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 790.432-2004 |
Distribution automation using distribution line carrier systems -- Part 4-32: Data communication protocols -- Data link layer -- Logical link control(LLC) |
(USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1120-2009 |
Specification of autotest and real-time simulation to for hydraulic turbine governor |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.29-2006 |
Analytical methods of steam and water in power plants Part 29: Determination of cation conductivity |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|