Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 37551-2019 |
Marine energy—Terminology of wave,tidal and other water current converters |
720 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 11805-2019 |
General specifications of automatic control components(devices)and their related system for hydroturbine-generating sets |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 50487-2008 |
Code for engineering geological invcstigation of water resources and hydropower |
3930 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 21718-2008E |
Fundamental technical requirementsfor small hydraulic turbines |
540 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 5198-2013 |
Code for the construction of crane girders anchored to rock face for hydropower and water resources projects |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 9652.1-2007 |
Specifications of control systems for hydraulic turbines |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5363-2006 |
Specifications for construction of hydraulic roller compacted bituminous concrete |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 5200-2004 |
Technical specification of jet grouting for hydropower and water resources projects |
570 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5379-2007 |
Design specifications for professional works for resident relocation planning of hydroelectric project |
825 (USD) |
via email in
1-8 business day
|
VALID
|
|
DB21/T 2481-2015 |
Inspection and assessment standard for separated item project construction quality of water conservancy engineering — Rural water conservancy engineering |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 8564-2003 |
Specification installation of hydraulic turbine generator units |
870 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 32745-2016 |
Guidelines on protection against sand abrasion and cavitation for small hydraulic turbines |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 50181-1993 |
Technical code for building and civil engineering in retarding basin |
1080 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB/T 30141-2013 |
Fundamental technical requirements for ring gate of hydraulic turbines |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DB37/T 3359-2018 |
Specifications for Impact Roller Compaction of Silty Soil Subgrade in the Yellow River Basin |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 17522-2006 |
General requirements for micro-hydro power generating equipments |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 36294-2018 |
Guide of archives classification for pumped storage power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18110-2016 |
Electromechanical equipment guide for small hydroelectric installations |
720 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB 17621-1998 |
Specification of reservoir operation for large and medium-scale hydropower stations |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5265-2011 |
|
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
|