Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
NB/T 42071-2016 |
The technical specification of intelligent unit for protection and control in smart substation |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 32518.1-2016 |
Field test code of controlled shunt reactor of extra high voltage―Part 1:Multistage controlled shunt reactor |
430 (USD) |
via email in
1 business day
|
VALID
|
|
T/CEC 167-2018 |
Technical requirements for interconnection between DC distribution network and AC distribution network |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 14598.301-2020 |
Technical requirements for power system continuous recorder |
660 (USD) |
via email in
1-5 business day
|
TO BE VALID
|
|
GB/T 19826-2014E |
General specification and safety requirements for DC power supply equipment of power projects |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 37015.1-2018 |
Performance of high-voltage direct current power transmission system using voltage sourced converters(VSC-HVDC)—Part 1:Steady-state |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 22390.3-2008E |
Control and protection equipment of high-voltage direct current(HVDC) transmission system-Part 3: DC pole control equipment |
480 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 36572-2018 |
Guidelines of cyber security protection for electric power system supervision and control |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 393-2010 |
Regulations of condition-based maintenance & test for electric equipment |
960 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 13730-2002 |
Dispatching automation systems for distric power networks |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 34577-2017 |
|
540 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 32353-2015 |
Interface specifications of real-time dynamic monitoring system for power systems |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 38922-2020 |
General specification for 35 kV and below voltage standardized protection equipment |
720 (USD) |
via email in
1-5 business day
|
TO BE VALID
|
|
GB/T 16927.3-2010 |
High voltage test techniques—Part 3:Definitions and requirements for on-site testing |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
NB/T 42014-2013 |
Integrated automation system for electrified railway traction power supply substation |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 22390.4-2008 |
Control and protection equipment of high-voltage direct current (HVDC) transmission system - Part 4: DC protection equipment |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 38878-2020 |
|
360 (USD) |
via email in
1-3 business day
|
TO BE VALID
|
|
GB/T 37755-2019 |
Technical specifications for modeling and coding fiber loop in smart substation |
720 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 22390.1-2008E |
Control and protection equipment of high-voltage direct current(HVDC) transmission system-Part 1: Operator control system |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
T/CEC 135-2017 |
Measurement & verification guidance of section power and electricity saving for residual heat and pressure power generation projects |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|