code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
GB/T 25841-2017 Guide of protection relaying for 1 000 kV power system (USD) via email in 1-3 business day VALID
DL/T 5469-2013 Guidelines for feasibility study cost estimation of transmission and transformer project (USD) via email in 1-3 business day VALID
GB/T 37155.2-2019 Technical guidance of protection and control system on regional power grid—Part 2:Information interface and communication (USD) via email in 1-3 business day VALID
Q/GDW 480-2015 Technical rule for distributed resources connected to power grid via email in VALID please email coc@codeofchina.com for quotation
Q/GDW 174-2008 via email in VALID please email coc@codeofchina.com for quotation
DL/T 5342-2006 Construction technology guidance for the assembling and erection of the steel towers of 750k V overhead transmission line (USD) via email in 1-3 business day ABOLISHED
GB/T 31367-2015 Technical guide for energy efficiency evaluation of medium and low voltage power distribution networks (USD) via email in 1-3 business day VALID
DL/T 5458-2012 Regulations for content and depth of detailed design of substation project (USD) via email in 1-8 business day VALID
GB/T 35702.1-2017 Power losses in voltage sourced converter(VSC)valves for high-voltage direct current(HVDC)systems—Part 1:General requirements (USD) via email in 1-3 business day VALID
GBJ 65-1983 Specifications for the design of grounding (earthing) of industrial and civil electric system(Trial) (USD) via email in 1-3 business day ABOLISHED
T/CEC 173-2018 Design code for distributed energy storage connecting to distribution network via email in VALID please email coc@codeofchina.com for quotation
Q/GDW 156-2006 The code of planning anf derign of urban electric network (USD) via email in 1-8 business day VALID
Q/GDW 145-2006 via email in VALID please email coc@codeofchina.com for quotation
DL/T 5472-2013 Guidelines for item segregation of construction budget for overhead transmission line projects (USD) via email in 1-3 business day VALID
DL/T 5344-2006 Acceptance specification for optical fiber telecommunication engineering of electric power via email in ABOLISHED please email coc@codeofchina.com for quotation
GB/T 30149-2019 CIM based efficient model exchange format (USD) via email in 1-3 business day VALID
GB/T 16927.4-2014 High voltage and high current test techniques—Part 4: Definitions and requirements for test currents and measuring systems (USD) via email in 1-10 business day VALID
T/CEC 136-2017 Longitudinal welding pipe for transmission line steel tubular tower via email in VALID please email coc@codeofchina.com for quotation
GB/T 24843-2018 Technical specification of 1 000 kV single phaseoil-immersed auto-transformer (USD) via email in 1-3 business day VALID
DL/T 5343-2006 Construction technology guidance for tension stringing of 750k V overhead transmission line via email in ABOLISHED please email coc@codeofchina.com for quotation
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020