code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
SY/T 6662.1-2012 via email in VALID please email coc@codeofchina.com for quotation
SY/T 6844-2011 Micro conductivity imaging logging tool (USD) via email in 1-3 business day VALID
SY/T 6911-2012 Petroleum drilling/workover electronic weight indicator system (USD) via email in 1-3 business day VALID
GB/T 24261.2-2010 Marine seismic digital streamer system - Part 2: Standards for specifying hydrophone streamer-cable characteristic (USD) via email in 1-3 business day ABOLISHED
SY/T 6156-2003 Technical specification of airgun source (USD) via email in 1-3 business day ABOLISHED
SY/T 5027-2012 Pneumatic components for petroleum drilling and production equipment via email in 1-3 business day VALID please email coc@codeofchina.com for quotation
GB/T 23802-2009 Petroleum and natural gas industries—Corrosion-resistant alloy seamless tubes for use as casing,tubing and coupling stock—Technical delivery conditions (USD) via email in 1-5 business day ABOLISHED
SY/T 5935-2007 The checking items and technical specifications for SYSTEM Ⅱ/SYSTEM 2000/IMAGE seismic data acquisition system (USD) via email in 1-3 business day
SY/T 6589-2004 Technical specification for long offset transient electromagnetic method (USD) via email in 1-3 business day ABOLISHED
SY/T 6901-2012 Technical specification for offshore seismic data acquisition seabed receiver positioning (USD) via email in 1-3 business day ABOLISHED
SY/T 7019-2014 Petroleum and natural gas industries-Drilling and production equipment- Mobile oil pumping device via email in VALID please email coc@codeofchina.com for quotation
SY/T 7042-2016 High strain SAWL steel line pipe for strain-based design pipelines via email in VALID please email coc@codeofchina.com for quotation
GB/T 21412.15-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 15:Subsea structures and manifolds (USD) via email in 1-8 business day VALID
GB/T 25430-2010 Specification for drill through equipment—Rotating control devices (USD) via email in 1-8 business day VALID
GB/T 21412.8-2010 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 8:Remotely Operated Vehicle (ROV) interfaces on subsea production systems (USD) via email in 1-8 business day VALID
GB/T 21412.11-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 11:Recommended practice for flexible pipe (USD) via email in 1-10 business day VALID
SY/T 6408-2012 Recommended practice for use and procedures for inspections,maintenance and repair of drilling and well servicing structures (USD) via email in 1-8 business day ABOLISHED
SY/T 6586-2014 Site installation and inspection for drilling rigs via email in VALID please email coc@codeofchina.com for quotation
GB/T 25429-2010 Specification for drill string non-return valve (USD) via email in 1-3 business day VALID
SY/T 6736.1-2008 Marine seismic digital streamer system-Part 1:Standards for specifying hydrophone parameters (USD) via email in 1-3 business day
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020