Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5363-1997 |
The Division of Hyduocarbon Bearing Sequence |
(USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5366-2000 |
Technological requirement of coring data of development wells |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6365-1998 |
Methodology for the initial pressure and the hydrodynamic system hydrocarbon reservoirs |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SH/T 3601-2009 |
Regulation for construction technology of reactor-regenerator system equipment of catalytic cracking unit |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 5386-2000 |
The regulations of proved reserves calculation of petroleum The part of fractured oil and gas reservoir |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6113-1994 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6676-2007 |
The calibration method of drilling fluid density meter |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SH/T 3504-2009 |
Specificaton for construction quality inspection and acceptance of reactor-regenerator system equipment of catalytic cracking unit |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 0540-2006 |
Type and basal parameters of heaters used in petroleum industry |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6095-2000 |
Technical requirements for programming development plan of lenticular sandstone gas field |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5367-1998 |
The method for Calculating oil recoverable reserves |
(USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6102-2006 |
Oil field development monitoring and data requirement |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6313.2-1998 |
The method of determining the oil-gas-water contant—The gas-water contacter |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6704-2007 |
The calibration method of inclinometer calibration facility |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5271-2000 |
Instructions on free point indicating and backing-off with shooting |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6336-1997 |
The method of separation and examination of heavly minarals for sedimentary rock |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5483-1997 |
Technology criteria for conventional drill stem testing |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SH/T 3533-2013 |
Specification for the construction and acceptance of piping works for watersupply and drainage in petrochemical industry |
(USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6510-2000 |
Technical requirement for steam injection development project design of heavy oil reservoir |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 0540-1994 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|