Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 6381-1986 |
Universal control chart |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 8056-1987 |
Statistical interpretation of data--Detection and handling of outlying observations in exponential sample |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 33260.4-2018 |
Capability of detection—Part 4:Methodology for comparing the minimum detectable value with a given value |
160 (USD) |
via email in
1 business day
|
VALID
|
|
GB/T 6378.1-2008 |
Sampling procedures for inspection by variables - Part 1: Specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection for a single quality characteristic and a single AQL |
1320 (USD) |
via email in
1-10 business day
|
VALID
|
|
GB/T 13262-1991 |
Single sampling procedures and tables for inspection having desired operating characteristics by attributes for percent nonconforming |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 4088-2008 |
Statistical interpretation of data Estimation and hypothesis test of parameter in binomial distribution |
780 (USD) |
via email in
1-8 business day
|
VALID
|
|
GB/T 15500-1995 |
Methods of random sampling by utilizing electronic sampler of random number |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 8052-2002 |
Single and multi-level continuous sampling procedures and tables for inspection by attributes |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 2828.4-2008 |
Sampling procedures for inspection by attributes - Part 4: Procedures for assessment of declared quality levels |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 4886-2002 |
Control charts for arithmetic average with warning limits |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 33260.3-2018 |
Capability of detection—Part 3:Methodology for determination of the critical value for the response variable when no calibration data are used |
220 (USD) |
via email in
1 business day
|
VALID
|
|
GB/T 16307-1996 |
Sequential sampling plans for inspection by variables for percent nonconforming (known STANDARD deviation) |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 6379.2-2004 |
Accuracy (trueness and precision) ofmeasurement methods and results?Part 2:Basic method for the determination of repeatability and reproducibility of a STANDARD measurement method |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 3358.3-1993 |
Terms for statistics. Part Ⅲ: terms for experimentaldesign |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB 4882-1985 |
Statistical interpretation of data--Normality tests |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 13264-2008 |
Sampling procedures and tables for small lot inspection by attributes for percent nonconforming items |
405 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 28863-2012 |
Sampling inspection procedures for commodity applying to the case with prior information of quality |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 8170-1987 |
Rules for rounding off of numberical values |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 6378-2002 |
Sampling procedures and charts for inspection by variables for percent nonconforming (Applied to inspection of successive lots or batches) |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 4089-1983 |
Statistical interpretation of data;Estimation of parameter in Poisson distribution |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|