Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
YS/T 3014-2013 |
Gold-loaded carbon |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3017-2012 |
Technical specification for safety management of solid sodium cyanide in gold industry |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3015.3-2013 |
Methods for chemical analysis of gold-loaded carbon—Part 3:Determination of calcium and magnesium contents—Flame atomic absorption spectrometry |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3015.1-2013 |
Methods for chemical analysis of gold-loaded carbon—Part 1:Determination of moisture content—Desiccation gravimetric method |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3007-2012 |
The norm of energy consumption per unit product of electric heating gold loaded carbon desorption and electrolytic process |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3003-2011 |
Regulations of the compilation on feasibility study report in the gold industry projects |
1140 (USD) |
via email in
1-8 business day
|
VALID
|
|
YS/T 3008-2012 |
The norm of energy consumption per unit product of fuel(diesel) activated carbon regeneration process |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DB37/T 3199-2018 |
Detailed rule for the system of screening for and elimination of industry commerce and trade risks of work safety accidents of Undergroud glod minin |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 4101.1-1983 |
|
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
YS/T 3015.2-2013 |
Methods for chemical analysis of gold-loaded carbon—Part 2:Determination of copper and iron contents—Flame atomic absorption spectrometry |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DZ/T 0314-2018 |
Green Mine Construction Specification of Gold Industry |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YS/T 3018-2013 |
Safety melting technical specification for gold dore and bullion production |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3016-2013 |
Special reactor for ozone oxidation process |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3021-2013 |
Calculation of gold recovery rate for CIP Process |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
YS/T 3019-2013 |
The Safety Technical Specification for Gold Heap Leaching Process |
120 (USD) |
via email in
1 business day
|
VALID
|
|
YS/T 3022-2013 |
Technical specification for test work of whole ore gold leaching with cyanide |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
YB 4067-1991 |
|
45 (USD) |
via email in
1-3 business day
|
VALID
|
|
DB37/T 3198-2018 |
Implementation Guidelines for the Management and Control System of Risk Classification for Production Safety of Underground gold mining |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
YB/T 2430-1988 |
Gold concentrates |
184 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
GB 4101.2-1983 |
|
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|