Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB 5005-1985 |
|
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6592-2004 |
Procedure for cement evaluation |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 5416.4-2007 |
Measurement and inspection regulation of directional surveying instruments Part 4:Measurement while drilling with wireline |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6526-2002 |
Measuring method of dynamic reaction rate for hydrochloric acid with carbonate rock |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6676-2007 |
The calibration method of drilling fluid density meter |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5622-1993 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY 5623-1993 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 16783.2-2012 |
Petroleum and natural gas industries—Field testing of drilling fluids—Part 2:Oil-based fluids |
960 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 6058-2004 |
Operation procedures for lifting and laying down of self-electing mast |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 5666-1993 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 10022.1-2001 |
Specification for Cementing Design of Offshore Oil well Unit 1:Cement slurry design and test |
1215 (USD) |
via email in
1-10 business day
|
|
|
SY/T 5724-2008 |
Design method of casing string strength |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 5663-1994 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5623-2009 |
Prediction and detection methods of formation pressure |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 5005-1994 |
Barite for drilling fluids |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6704-2007 |
The calibration method of inclinometer calibration facility |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6426-2005 |
Specification for well control technology of drilling |
1110 (USD) |
via email in
1-8 business day
|
|
|
SY/T 5378-1991 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 6332-2004 |
Trajectory control for directional well |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6397-1999 |
Evaluation procedure of drilling fluid biocides |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
|