code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
GB/T 21412.15-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 15:Subsea structures and manifolds 840 (USD) via email in 1-8 business day VALID
GB/T 21412.8-2010 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 8:Remotely Operated Vehicle (ROV) interfaces on subsea production systems 900 (USD) via email in 1-8 business day VALID
GB/T 21412.11-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 11:Recommended practice for flexible pipe 3420 (USD) via email in 1-10 business day VALID
SY/T 4095-2012 Technical specifications for structure design and construction of mobile steel platform in beach-shallow sea 780 (USD) via email in 1-8 business day
GB/T 21445.2-2008 Petroleum and natural gas industries - Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications 810 (USD) via email in 1-8 business day VALID
SY/T 10023.2-2012 Method of offshore oil/gas field development project economic evaluation—Part2:Co-operative offshore oil/gas field 600 (USD) via email in 1-5 business day VALID
SY/T 4101-2012 Technical specification of geotechnical investigation in beach-shallow sea 600 (USD) via email in 1-5 business day VALID
GB/T 21412.10-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 10:Specification for bonded flexible pipe 855 (USD) via email in 1-8 business day VALID
GB/T 35989.1-2018 Petroleum and natural gas industries—Floating offshore structures—Part 1:Monohulls,semi-submersibles and spars 2280 (USD) via email in 1-10 business day VALID
GB/T 21412.6-2009 Petroleum and natural gas industries - Design and operation of subsea production systems - Part 6: Subsea production control systems 660 (USD) via email in 1-5 business day ABOLISHED
SY/T 7051-2016 Technical code for survey of artificial island via email in VALID please email coc@codeofchina.com for quotation
GB/T 21412.3-2009 Petroleum and natural gas industries - Design and operation of subsea production systems - Part 3: Through flowline (TFL) systems via email in VALID please email coc@codeofchina.com for quotation
ZB E 91001-1989 90 (USD) via email in 1 business day SUPERSEDED
SY/T 6877-2012 Buckling strength analysis of bars and frames,and spherical shells 330 (USD) via email in 1-3 business day VALID
GB/T 21412.5-2010 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5:Subsea umbilicals 1200 (USD) via email in 1-8 business day ABOLISHED
SY/T 10031-2000 Recommended Practice for Planning,Designing and Constructing Structures and Pipelines for Arctic Conditions 1305 (USD) via email in 1-10 business day VALID
SH/T 3414-1999 Specification for selection inspection and acceptance of bottom sampler for vertical steel light oil tanks in petrochemical industry 270 (USD) via email in 1-3 business day ABOLISHED
GB/T 35987-2018 Specification for offshore engineering structure weighing 240 (USD) via email in 1-3 business day VALID
GB/T 21412.5-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5:Subsea umbilicals via email in 1-3 business day VALID please email coc@codeofchina.com for quotation
GB/T 20661-2006 Petroleum and natural gas industries - Flexible pipe systems for subsea and marine riser applications via email in 1-3 business day VALID please email coc@codeofchina.com for quotation
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020