Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 8564-2003 |
Specification installation of hydraulic turbine generator units |
870 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 469-2004 |
Fans performance testing in situ for power boiler |
1095 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5358-2006 |
Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering |
1140 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 818-2002 |
Technical guide for carbide phase analysis of low alloy heat resistant steels |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
NY/T 1137-2006 |
Erection regulations for small wind turbine generator off-grid system |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 829-2002 |
Technical reqirements for stoking single phase alternating current induction watt-hour meter |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 31461-2015 |
Guide for run back and fast cut back control in fossil fuel power plant |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5191-2004 |
Code of construction acceptance on wind power plant project |
885 (USD) |
via email in
1-8 business day
|
VALID
|
|
T/CEC 141-2017 |
Installation and acceptance specification for on-line monitoring device of gases dissolved in transformer oil |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 519-2004 |
Acceptance criterion for ion exchange resins used in water treatment in fossil-fired power plants |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 822-2002 |
Code of test and adcceptance of monitoring and control system for hydropower plants |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 875-2004 |
Basic requirements for design and test of construction machines and tools of overhead transmission line |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 782-2001 |
Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above |
345 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 466-2004 |
Guide for type selection for pulverizers and pulverizing systems of power station |
855 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 851-2004 |
Acceptance tests for combined-cycle power plants |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 468-1992 |
|
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SD 165-1987 |
|
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 467-2004 |
Performance test for pulverizers and pulverizing systems of power station |
885 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
GB/T 26863-2011 |
Terminology of monitoring and control system of thermal power station |
1800 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 852-2004 |
Guide for boiler start-up commissioning test |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|