code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
GB/T 8564-2003 Specification installation of hydraulic turbine generator units (USD) via email in 1-8 business day VALID
DL/T 469-2004 Fans performance testing in situ for power boiler (USD) via email in 1-8 business day VALID
DL/T 5358-2006 Technical code for anticorrosion of metal structures in hydroelectric and hydraulic engineering (USD) via email in 1-8 business day VALID
DL/T 818-2002 Technical guide for carbide phase analysis of low alloy heat resistant steels (USD) via email in 1-3 business day VALID
NY/T 1137-2006 Erection regulations for small wind turbine generator off-grid system (USD) via email in 1-3 business day VALID
DL/T 829-2002 Technical reqirements for stoking single phase alternating current induction watt-hour meter (USD) via email in 1-3 business day VALID
GB/T 31461-2015 Guide for run back and fast cut back control in fossil fuel power plant (USD) via email in 1-3 business day VALID
DL/T 5191-2004 Code of construction acceptance on wind power plant project (USD) via email in 1-8 business day VALID
T/CEC 141-2017 Installation and acceptance specification for on-line monitoring device of gases dissolved in transformer oil via email in VALID please email coc@codeofchina.com for quotation
DL/T 519-2004 Acceptance criterion for ion exchange resins used in water treatment in fossil-fired power plants (USD) via email in 1-3 business day ABOLISHED
DL/T 822-2002 Code of test and adcceptance of monitoring and control system for hydropower plants (USD) via email in 1-3 business day ABOLISHED
DL/T 875-2004 Basic requirements for design and test of construction machines and tools of overhead transmission line (USD) via email in 1-3 business day ABOLISHED
DL/T 782-2001 Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above (USD) via email in 1-3 business day VALID
DL/T 466-2004 Guide for type selection for pulverizers and pulverizing systems of power station (USD) via email in 1-8 business day ABOLISHED
DL/T 851-2004 Acceptance tests for combined-cycle power plants (USD) via email in 1-3 business day VALID
DL/T 468-1992 (USD) via email in 1-3 business day ABOLISHED
SD 165-1987 (USD) via email in 1-3 business day ABOLISHED
DL/T 467-2004 Performance test for pulverizers and pulverizing systems of power station (USD) via email in 1-8 business day ABOLISHED
GB/T 26863-2011 Terminology of monitoring and control system of thermal power station (USD) via email in 1-10 business day VALID
DL/T 852-2004 Guide for boiler start-up commissioning test (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020