Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 656-2006 |
Code for acceptance test of turbine control system in fossil fuel power plant |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 677-2009 |
Checking and calibration code for on-line chemical monitoring instrument of power plant |
885 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1029-2006 |
Laboratory quality management guide for water quality analyzers in thermal power plant |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 911-2004 |
Frequency response analysis on winding deformation of power transfermers |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.13-2006 |
Analytical methods of steam and water in power plants Part 13: Determination of phosphate (Spectrometric method) |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 659-1998 |
Code for on-line acceptance test of distributed control system in fossil fuel power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1002-2006 |
Calibration for low-level dissolved oxygen meter -- Standard gases calibration |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 656-1998 |
Code for on-line acceptance test of turbine control system in fossil fuel power plant |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 502.14-2006 |
Analytical methods of steam and water in power plants Part 14: Determination of copper (Spectrometric method using dicyclohexanoneoxalyldihydrazone) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1397.1-2014 |
General specification for DC power system test equipments of electric power system-Part 1: Battery voltage inspection apparatus |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 846.2-2004 |
General technical specifications for high voltage test equipments Part 2: Impulse voltage measuring system |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 658-2006 |
Code for on-line acceptance test of sequence control system in fossil fuel power plant |
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 356-2010 |
Calibration specification of partial discharge measuring devices |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 502.11-2006 |
Analytical methods of steam and water in power plants Part 11: Determination of sulfate (Spectrometric method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 999-2006 |
The gradational standard of spheroidizition for 2.25Cr-1Mo steel used in power plant |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1397.3-2014 |
General specification for DC power system test equipments of electric power system-Part 3:Testing system of the charging device characteristics |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 624-1997 |
Technical specifications of test equipment based on micro-computer for relaying protection |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1160-2012 |
The code of erection and acceptance for arc spraying on boiler heating surface of power plant |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1161-2012 |
The technical inspection codes for metal and structural components in ultra-supercritical units |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 655-1998 |
Code for on-line acceptance test of furnace safeguard supervisory system in fossil fuel power plant |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|