DL/T 802.6-2007 |
Technical requirements for electric cable conduits Part 6:Cable conduits of socket type precast concrete |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 802.3-2007 |
Technical requirements for electric cable conduits Part 3:Cable conduits of chlorinated polyvinyl chloride and unplasticized polyvinyl chloride |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 802.1-2007 |
Technical requirements for electric cable conduits Part 1:General |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 795-2001 |
Digital exchange for power system dispatching |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 945-2005 |
Periodical concrete mixing planting |
195 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1071-2007 |
Code for transportion of electrical power large equipment |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1074-2007 |
Integrated uninterruptible power supply equipment of DC and AC for power system |
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1116-2009 |
Standard test method for efficacy of microbicides used in cooling water system |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 857-2004 |
Specification of rectification inversion equipment for battery of power plant and substation |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 38436-2019 |
Engineering data handover specification for power transmission and transformation |
1200 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 944-2005 |
Specification of concrete pump |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 946-2005 |
Cranes for water resources and electric power construction |
465 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 807-2002 |
Standard of scrapping 201X7 strong base anion exchange resin for water treatment in thermal power plant |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 856-2004 |
DC electrical source supervisor for electric power |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
T/CPSS 1005-2018 |
Technical Specification for voltage sag monitoring system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 806-2002 |
Scaling-corrosion inhibitor of recirculating cooling water system in thermal power plants |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1056-2007 |
Technical supervision guide for instrument and control in power plant |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 951-2005 |
Guide for the acceptance of reverse osmosis equipment for water treatment in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 692-2008 |
Electric power trade urgently saving work rules |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 813-2002 |
Specification for 12kV H.V. alternating current automatic circuit recloser |
225 (USD) |
via email in
1-3 business day
|
VALID
|
|
|