Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 37911.2-2019 |
Application interface of BDS timing for power system—Part 2:Testing specification |
225 (USD) |
via email in
1 business day
|
VALID
|
|
GB 2801-1981 |
|
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 5641-2008 |
Flared couplings - Union cross |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 9289-1988 |
Terminology in sugar industry |
630 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB/T 30481-2013 |
Woodworking machines—Curtain coating machines—Nomenclature |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 16937.2-1997 |
Earth-moving machinery-Operators field of view-Evaluation method |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 5009.161-2003 |
Determination of organophosphorus pesticide multiresidues in animal foods |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 20901-2007 |
Specification for equipping and managing of measuring instrument of energy in petroleum and petrochemical industry |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 8350-2003 |
Conveyor chains,attachments and sprockets |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 20028-2005 |
Rubber,vulcanized or thermoplastic—Estimation of life-time and maximum temperature of of use from an Arrhenius plot |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 6609.1-2004 |
Chemical analysis methods and Determination of physical performance of alumina Determination of moisture-Gravimetric method |
180 (USD) |
via email in
1 business day
|
|
|
GB 2989-1987 |
High-alumina refractory bricks for blast furnaces |
180 (USD) |
via email in
1 business day
|
|
|
GB/T 15870-1995 |
Chrome thin films for hard surface photomasks |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 5974.2-2006 |
Heavy thimbles for use with steel wire ropes |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB 7976-1987 |
Insulating paper and board-Determination of the electrical conductivity for the water extract |
30 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 4189-1984 |
Doped tungsten bars |
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 17007-1997 |
Measuring methods for insulated-gate bipolar transistor |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 15135-2002 |
Gas turbines--Vocabulary |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 7095.3-1986 |
|
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 1115.1-2002 |
Cylindrical cutters Part 1:The types and dimensions |
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
|