Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JB/T 11039-2010 |
Type completion method of electric and electronic products for plateau |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 37137-2018 |
On-site inspections method of a.c. circuit systems for 220 kV substations on plateau |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 2424.1-1989 |
Basic environmental testing procedures for electric and electronic products Guidance for high temperature and low temperature tests |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 26670-2011 |
Guide of eco-design for medium and small size electric motors |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 2423.11-1982 |
|
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
ZB K 04002-1989 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 6279-1986 |
Limits and methods of measurement of radio interference characteristics of vehicles motor boats and spark-ignited engine-driven devices |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 5170.16-1985 |
Inspection methods for basic parameters of environmental testing equipments for electric and electronic products; Centrifugal machines for constant acceleration test |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB 2682-1981 |
Colours of indicator lights and push-buttons used in electrical assembly devices |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 7354-1987 |
Partial discharge measurements |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 2423.45-2012 |
Environmental testing - Part 2: Test methods - Test Z/ABDM: Climatic sequence |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 7159-1987 |
General rules for the formulation of letter symbols in electrotechnology |
210 (USD) |
via email in
1-3 business day
|
|
|
GB/T 2900.52-2008 |
Electrotechnical terminology - Generation transmission and distribution of electricity - Generation |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 37143-2018 |
Maturity testing for electric and electronic products |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 4728.2-1998 |
Graphical symbols for diagrams. Part 2: Symbol elements, qualifying symbols and other symbols having general application |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 2423.42-1995 |
Environmental testing for electric and electronic products Combined low temperature/low air pressure/vibration(sinusoidal)test |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 5170.10-2017 |
Inspection methods for environmental testing equipments—Part 10:Combined high and low temperature/low air pressure testing equipments |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 2423.48-2018 |
Environmental testing—Part 2:Test methods—Test Ff:Vibration—Time-history and sine-beat method |
600 (USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 28179-2011 |
Environmentally conscious design for electrical and electronic product—Indentification of environmental aspects |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 2423.38-2005 |
Environmental test for electric and electronic products--Part 2: Test method--Test R:Water test method and guidance |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
|