code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
GB/T 2820.11-2012 Reciprocating internal combustion engine driven alternating current generating sets - Part 11: Rotary uninterruptible power systems - Performance requirements and test methods 660 (USD) via email in 1-5 business day VALID
GB/T 21426-2008 Special environmental condition - Requirements for electric power plant with internal combustion engines on plateau 165 (USD) via email in 1-3 business day VALID
GB/T 37089-2018 Reciprocating internal combustion engine driven alternating current generating sets—Controller 420 (USD) via email in 1-3 business day VALID
TB 10039-1993 Design code of stand-by diesel power station for railway 510 (USD) via email in 1-5 business day VALID
DL/T 717-2000 Technical guide for the nondestructive testing of turbine-generator rotor bores 165 (USD) via email in 1-3 business day ABOLISHED
JB/T 8194-2001 Terminology for electric power plant with internal combustion engines 480 (USD) via email in 1-5 business day VALID
GB/T 2820.4-1997 Reciprocating internal combustion engine driven alternating current generating sets Part 4: Controlgear and switchgear via email in 1-3 business day ABOLISHED please email coc@codeofchina.com for quotation
DL/T 651-1998 Requirements for hydrogen humidity of generators using hydrogen as a coolant 210 (USD) via email in 1-3 business day ABOLISHED
DL/T 735-2000 Measurement and evaluation of the dynamic characteristic on stator end windings of the large turbo-generator 120 (USD) via email in 1-3 business day VALID
JB/T 7605-1994 45 (USD) via email in 1-3 business day VALID
GB/Z 32519.3-2016 1 000 MW class hydraulic—Generator—Part 3:Quality inspection stands for installation 540 (USD) via email in 1-5 business day VALID
GB/T 21425-2008 Low-noise electric power plant with internal combustion engine for general specification 225 (USD) via email in 1-3 business day VALID
GB/T 21427-2008 Special environmental condition - Requirements and test methods for electric powerplant with internal combustion engines in dry heat-desert 195 (USD) via email in 1-3 business day VALID
GB/T 31038-2014 General technical condition for high voltage diesel-generating sets 360 (USD) via email in 1-3 business day VALID
GB/T 2820.6-2009 Reciprocating internal combustion engine driven alternating current generating sets - Part 6: Test methods 240 (USD) via email in 1-3 business day VALID
DL/T 591-1996 Directives of thermal instrumentation and control for turbo-generator in power plant 120 (USD) via email in 1-3 business day ABOLISHED
GB/T 2820.1-1997 Reciprocating internal combustion engine driven alternating current generating sets Part 1:Application, ratings and performance via email in 1-3 business day ABOLISHED please email coc@codeofchina.com for quotation
GB/T 32715-2016 Integral micro hydroturbine generator unit 240 (USD) via email in 1-3 business day VALID
SD 152-1987 195 (USD) via email in 1-3 business day ABOLISHED
JB/T 1403-1999 Compilation rules for title and model of movable power plant 75 (USD) via email in 1-3 business day VALID
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020