Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
MT 99-1991 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT/T 526-1995 |
|
60 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 358-1994 |
|
75 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 127-1985 |
JSX-2A Type Ultrasonic Imaging Logging System |
150 (USD) |
via email in
1 business day
|
VALID
|
|
MT/T 246-2006 |
Pick for shearer and boom roadheader |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 68-2002 |
Charging racks for cap lamps |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 495-1995 |
|
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 710-1997 |
Flameproof circuit breaker with plugs and sockets for coal mine |
150 (USD) |
via email in
1-3 business day
|
|
|
MT/T 725.2-1997 |
Technical condition of coal for metallurgical coke supplied by Xinwen mining bureau |
45 (USD) |
via email in
1-3 business day
|
|
|
MT/T 240-1997 |
General specification for the water nozzle |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT/T 676-1997 |
Structure and parameters of the idler rollers for boom roadheaders |
45 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 282-1994 |
|
90 (USD) |
via email in
1-3 business day
|
|
|
MT/T 818.12-2009 |
Cables for coal mine-Part 12: PVC insulation power cables for coal mine rated voltages up to andincluding 1.8/3kV |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 38-1987 |
General Requirements for Sampling of Coal and Rock for Physical and Mechanical Property Determination |
184 (USD) |
via email in
1 business day
|
VALID
|
|
MT/T 712-1997 |
Determining method of the classification efficiency for dust prevention measures |
45 (USD) |
via email in
1-3 business day
|
VALID
|
|
MT 754-1997 |
Technical specification for extractable axial-flow used for the ground of small mine |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT 107.3-1985 |
|
180 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
MT/T 716-2005 |
Delivery requirements of wire ropes for mine hoisting |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
MT/T 727.2-1997 |
Technical condition of coal for pulverized coal-fired boiler for power generation supplied by Fuxin mining bureau |
180 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
MT/T 188.3-2000 |
Mine emulsion pump station-technical condition of unloading valve |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
|