Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JB/T 10390-2002 |
Reliability design methods for fieldbus intelligence instrument |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 34039-2017 |
Technical specification for remote terminal unit(RTU) |
660 (USD) |
via email in
1-5 business day
|
VALID
|
|
DB21/T 2576-2016 |
Code for the dimming control of LED lighting in highway tunnel |
|
via email in
1 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
SG 382-1984 |
|
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 17165.4-1997 |
Fuzzy control devices and systems Part 4:Evaluation requirements of basic properties of fuzzy control for washing machine |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 591-2010 |
Specification of instrumentation and control for turbine-generator in fossil fuel power plant |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 9092-1988 |
Automatic switches for metering and load control |
375 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 9469.6-1988 |
Process data highway,type C (PROWAY C),for distributed process control systems-The medium access control (MAC) sublayer |
585 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 592-2010 |
Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB 5010-1985 |
|
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 38921-2020 |
Specification of steam turbine safety protection system for thermal power plant |
300 (USD) |
via email in
1-3 business day
|
TO BE VALID
|
|
DL/T 589-2010 |
Specification of instrumentation and control for coal fired boiler in fossilfuel power plant |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 996-2006 |
Specification of steam turbine electro-hydraulic control system in fossil fuel power plant |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 9469.3-1988 |
Process data highway,type C(PROWAY C),for distributed process control systems-The interface to PROWAY |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 590-2010 |
Specification of instrumentation and control for condensation type turbine in fossil fuel power plant |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 17165.1-1997 |
Fuzzy control devices and systems part 1:fundamental terminology |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 36285-2018 |
Specification of steam turbine electro-hydrauli ccontrol system for thermal power plant |
400 (USD) |
via email in
1 business day
|
VALID
|
|
GB/T 17165.2-1997 |
Fuzzy control devices and systems Part 2:General requirements for evaluating performance of fuzzy control unit |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 9469.2-1988 |
Process data highway,type C(PROWAY C),for distributed process control systems-Functional requirements |
60 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 9469.5-1988 |
Process data highway,type C (PROWAY C),for distributed process control systems-PLC-MAC interface and service specification |
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|