Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
GB/T 18916.6-2004 |
Norm of water intake—Part 6:Brewing industry |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 18916.16-2014 |
Norm of water intake—Part 16:Electrolytic aluminium production |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 24602-2009 |
Disposal of sludge from municipal wastewater treatment plant—Quality of sludge used in separate incineration |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18916.9-2006 |
Norm of water intake―Part 9:MonosodiumL-glutamate production |
|
via email in
1-3 business day
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
ZBBZH/GJ 15 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
CJ/T 294-2018 |
Rotating disc aerator |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18916.23-2015 |
Norm of water intake—Part 23:Citrate acid prodnction |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18916.9-2014 |
Norm of water intake—Part 9:Monosodium L-glutamate production |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 18916.17-2016 |
Norm of water intake—Part 17:Manufacture of accumulating type of bauxite |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJJ 32-1989 |
|
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CECS 46-1993 |
Design standard for removal of fluorides from drinking water |
240 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
CJ/T 312-2009 |
Measurement of noise from building water drainage piping system |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
HY/T 245-2018 |
Test method of energy consumption for seawater desalination plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
GBJ 43-1982 |
Appraisal criteria for antiseismic outdoor water supply and drainage tacilities |
280 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
GB/T 18916.43-2019 |
Norm of water intake—Part 43:Production of ion-adsorption rare earth ore separation |
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 24912-2010 |
Boosting pressure water supply equipment for columned tank |
300 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 28888-2012 |
Technical requirements of gas monitoring for sewer and septic tanks |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
SH 3094-1999 |
Code for the design of drain-channel for petrochemical industry |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 37621-2019 |
Buried type butterfly valve |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 37565-2019 |
General specification of screen machine for water supply and drainage service |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
|