Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
CJ/T 151-2016 |
Light gauge stainless steel tubes |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJ/T 251-2007 |
Cope manifort |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJJ/T 98-2003 |
Technical specification of polyethylene (PE) crosslinked polyethylene (PE-X) and polyethylene of raised temperature resistance (PE-RT) pipeline engineering for water supply in building |
795 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
CECS 79-1996 |
|
240 (USD) |
via email in
1-3 business day
|
|
|
GB/T 31894-2015 |
Water supply equipment of low voice additive pipe pressure |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
CECS 41-1992 |
SPECIFICATION FOR DESIGN INSTALLATION AND INSPECTION OF UPVC PIPELINE FOR WATER SUPPLY IN BUILDING |
810 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
CECS 168-2004 |
Technical specification for flexible joint cast iron pipe system of building drainage |
375 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJ/T 3053-1995 |
Isolative gas-pressurized expansion device |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DB35/T 933-2009 |
Coating plastic steel pipe for water supply |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
CECS 94-1997 |
|
525 (USD) |
via email in
1-5 business day
|
|
|
CJJ 142-2014 |
Technical specification for raindrainage system of building roof |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
CJ/T 120-2008 |
Coating plastic steel pipe for water supply |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CJ/T 159-2006 |
Polyethylene/Aluminium/Polyethylene composite pressure pipe(butt-welded by aluminium pipe) |
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
CJJ/T 29-1998 |
|
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
GB 50268-1997 |
Code for construction and acceptance of water supply and sewerage pipelines |
1530 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
CJ/T 282-2008 |
Solw closure butterfly check valve |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
CECS 41-2004 |
Technical specification for PVC-U pipeline engineering for water supply in buildings |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
CJJ 12-1999 |
Specification for installation and acceptance of domestic gas burning appliances |
645 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|