Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SL 274-2001 |
Design code for rolled earth -rock fill dams |
1290 (USD) |
via email in
1-10 business day
|
VALID
|
|
SL 281-2003 |
Design specification for steel penstocks of hydroelectric stations |
3855 (USD) |
via email in
1-10 business day
|
VALID
|
|
YBJ 11-1986 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5086-1999 |
Design guide of concrete production system for hydropower and water conservancy project |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5091-1999 |
Ground design guide for hydro-power station |
720 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SL 25-1991 |
|
1110 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5410-2009 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 5018-1994 |
Specification for manufacture installation and acceptance of steel gate in hydraulic and hydroelectric engineering |
1200 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SD 220-1987 |
|
1650 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 5194-2004 |
Code of water quality analysis for hydropower and water resources engineering geological investigation |
4785 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SL 377-2007 |
Technical specification of shotcrete and rock bolt for water resources and hydropower project |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5139-2001 |
Specification for designing gas-insulation metal-enclosed switchgear of hydropower station |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5152-2001 |
Test code of water analysis for hydraulic concrete |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SL 76-1994 |
Hydroenergy design code for small hydro power projects |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 5212-2005 |
Code on compiling tender design report of hydropower projects |
2205 (USD) |
via email in
1-10 business day
|
VALID
|
|
SDJ 275-1988 |
|
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1135-2009 |
Potentiometric type displacementmeter |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5013-2005 |
Code of operation in drilling for hydropower and hydraulic engineering |
1710 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SL 106-1996 |
Design criterion of reservoir management |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SD 266-1988 |
|
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|