Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
JTJ 01-1988 |
|
1830 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
JT/T 522-2004 |
Curing compounds of concrete for highway engineering |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
JTJ/T 037.1-2000 |
Technical Specifications for Construction on Cement Concrete Pavement for Highway |
|
via email in
|
|
please email coc@codeofchina.com for quotation
|
JT/T 1149-2017 |
Layered double hydroxides anti ultraviolet aging agent used for pavement asphalt |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
GB/T 24716-2009 |
General specifications of solar energy power system for highway facilities |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DB33/T 628.4-2015 |
Criterion of valuation with Bill quantity for transportation construction Part 4:Ship lock engineering |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 608-2004 |
Programmmable controller of tunnel |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 24721.4-2009 |
Glass fiber reinforced plastic product for highway—Part 4:Non-pressure communications well lid |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/T 31439.1-2015 |
Corrugated sheet steel beams for road guardrail—Part 1:W-beam guardrail |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
JT/T 690-2007 |
Test method for photometric characteristics of retroreflectors |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 537-2004 |
Corrosion inhibitor for reinforcing steel in concrete |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JT/T 1126-2017 |
Highway engineering-Apparatus for single-side salt frost test of cement concrete |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JTG E 41-2005 |
Test Methods of Rock for Highway Engineering |
900 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY 4033-1993 |
Standard for Quality Inspection and Evaluation of Petroleum Construction Engineering Road Engineering |
2130 (USD) |
via email in
1-10 business day
|
|
|
JTG/T B07-01-2006 |
Specification for deterioration prevention of highway concrete structures |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
GB/T 28967-2012 |
Electronic toll collection—Technical requirement for the lane system |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
JT/T 686-2007 |
Measurer for impact resistance of retroreflective sheeting |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DB51/T 2512-2018 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JT/T 493-2003 |
Preformed pavement marking tape |
165 (USD) |
via email in
1-3 business day
|
|
|
JT/T 669-2006 |
Geosynthetics in highway engineerings-Sort capability demand and test method of composite materials |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
|