Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5112-1999 |
Specification for drilling and production hoisting equipment |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6391-1999 |
SEG-D seismic tape format |
660 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6613-2005 |
Recommended practice on the rheology and hydraulics of oil-well drilling fluids |
705 (USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 5596-1993 |
|
340 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5448-1992 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 6250-1996 |
Specification of density logging calibration devices |
300 (USD) |
via email in
1 business day
|
|
|
SY/T 6103-2004 |
Measurement of rock pore structure Method of image analysis |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 5329-1988 |
|
465 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY 6307-1997 |
The drilling safety provisions in the beachshallow water |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6002-1994 |
|
180 (USD) |
via email in
1 business day
|
|
|
SY/T 5663-1994 |
|
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4032.4-1993 |
Standard for Quality Inspection and Evaluation of Petroleum Construction Engineering Telecommunication Engineering (Toll Open-Wire Carrier Equipment Installing Engineering) |
570 (USD) |
via email in
1-5 business day
|
|
|
SY/T 4102-1995 |
Specification for test and installation of valve |
270 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY 7514-1988 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6148-1995 |
|
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6413-1999 |
Computerized logging system data collection roles |
180 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6095-2000 |
Technical requirements for programming development plan of lenticular sandstone gas field |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6469-2000 |
Crude pipeline technical code for practice of transportation with pour point depressants |
260 (USD) |
via email in
1 business day
|
|
|
SY/T 0048-2000 |
Design specification of general plan for oil and natural gas project |
1650 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 5880.2-1993 |
|
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|