code of china Chinese Classification Professional Classification ICS Classification Latest News

LoginRegister
Position: Standard Search VALID TO BE VALID SUPERSEDED TO BE SUPERSEDED ABOLISHED TO BE ABOLISHED
Standard No. Title Price(USD) Delivery Status Add To Cart
SY/T 6371-1998 General technical standard for geophone tester (USD) via email in 1-3 business day ABOLISHED
SY/T 5470-2002 (USD) via email in 1-3 business day ABOLISHED
SY/T 6557-2003 Guidelines for application of water spray systems for fire protection in the petroleum industry (USD) via email in 1-3 business day ABOLISHED
SY 5121-1986 via email in VALID please email coc@codeofchina.com for quotation
SY/T 6716-2008 Flexible composite pipe for high pressure transmission for petroleum and natural gas industries (USD) via email in 1-3 business day ABOLISHED
SY/T 6700-2007 Coiled line pipe (USD) via email in 1-5 business day ABOLISHED
SY/T 6349-2008 The safety code for operation of seismic drilling rig (USD) via email in 1-3 business day ABOLISHED
SY/T 6249-1996 Operation and maintenance for proton magnetometer (USD) via email in 1-3 business day ABOLISHED
SY 5312.14-1987 (USD) via email in 1-3 business day ABOLISHED
SY/T 6634-2005 Safety rules for beach and alongshore petroleum operation (USD) via email in 1-3 business day ABOLISHED
SY/T 6649-2006 Repairing Crude Oil Liquefied Petroleum Gas and Product Pipelines (USD) via email in 1-3 business day ABOLISHED
SY/T 5679-1993 via email in ABOLISHED please email coc@codeofchina.com for quotation
SY/T 6952.2-2013 Thermal casing string for strain-based design—Part2:Casing (USD) via email in 1-3 business day VALID
SY/T 6276-1997 via email in ABOLISHED please email coc@codeofchina.com for quotation
SY 6043-1994 (USD) via email in 1-3 business day ABOLISHED
SY/T 5247-1997 Washover operating methods (USD) via email in 1-3 business day ABOLISHED
SY/T 6394-1999 Dry-mixing operation method of oil well cement and additive (materials) (USD) via email in 1 business day SUPERSEDED
SY/T 5400.1-2000 (USD) via email in 1-3 business day ABOLISHED
SY/T 6573-2003 Measurement method for minimum miscibility pressure by slim tube test (USD) via email in 1-3 business day ABOLISHED
SY 7501-1984 (USD) via email in 1-3 business day ABOLISHED
About Us | Contact Us | Terms of Service | Privacy | Cancellation & Refund Policy | Payment
Tel:+86-10-8572 5655 Fax:+86-10-8581 9515 Email: coc@codeofchina.com QQ: 672269886
Copyright:TransForyou Co., Ltd. 2008-2020