Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
HG/T 20636~20637-1998 |
Relationship of design information between instrumentation with process/system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JB/T 10390-2002 |
Reliability design methods for fieldbus intelligence instrument |
255 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
JB/T 7352-2010 |
Solenoid valves for industrial-process measurement and control systems |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
JB/T 6239.5-2007 |
General methods for testing the performance of industrial process measurement and control instruments-Part 5:Electrical power supply fast transient/pulse immunity test |
75 (USD) |
via email in
1-3 business day
|
|
|
GB/Z 16656.1004-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 1004:Application module:Elemental geometric shape |
420 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20637.6-1998 |
Preparation of instrumentation specification |
1620 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 591-2010 |
Specification of instrumentation and control for turbine-generator in fossil fuel power plant |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20636.9-1998 |
Checking list for review and approval for engineering design of instrumentation |
285 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20637.5-1998 |
Preparation of instrumentation requisition |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/Z 16656.1006-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 1006:Application module:Foundation representation |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 4276-2011 |
Magnetic force level meter for liquefied gas tank trucks |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
HG/T 20637.4-1998 |
Preparation of requirements for instrumentation construction and erection |
420 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 592-2010 |
Specification of instrumentation and control for boiler feed water pump in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
JB/T 6875-2014 |
XCZ type moving-coil indicators for industrial-process measurement and control systems |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
HG/T 20573-1995 |
Code for Distributed Control System Engineering Design |
810 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
HG/T 20636.7-1998 |
Produce for engineering design of instrumentation |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
HG/T 20637.1-1998 |
Composition and preparation for engineering documents of instrumentation |
810 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
HG/T 20636.3-1998 |
Split of design work between instrumentation and piping |
390 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 589-2010 |
Specification of instrumentation and control for coal fired boiler in fossilfuel power plant |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
GB/Z 16656.1009-2010 |
Industrial automation systems and integration—Product data representation and exchange—Part 1009:Application module:Shape appearance and layers |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
|