Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 10032-2000 |
Rules For Building and Classing Single Point Moorings |
(USD) |
via email in
1-5 business day
|
VALID
|
|
GB/T 16783.2-2012 |
Petroleum and natural gas industries—Field testing of drilling fluids—Part 2:Oil-based fluids |
(USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 5842-2003 |
Technical requirements of compiling the development plan of sandstone oil field development geology and reservoir engineering |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6182-2008 |
Calibration for logging tool on production well profile |
(USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6421-1999 |
Measuring heat loss for equipments and pipes |
(USD) |
via email in
1-3 business day
|
|
|
SY 5974-1994 |
|
(USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
SY/T 6058-2004 |
Operation procedures for lifting and laying down of self-electing mast |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5587.3-2013 |
Code for conventional workover job—Part3:Killing well,displaced flow and induced flow |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6176-2004 |
Technical regulation of data collection on development well of gas reservoir |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5587.9-2007 |
Codes for conventional workover job-Part 9: Procedure of wellhead for replacing opertating |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6451-2000 |
Specification for exploring well logging data processing and interpreting technology |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6214-2016 |
Gelling agent for viscous acid |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 10022.1-2001 |
Specification for Cementing Design of Offshore Oil well Unit 1:Cement slurry design and test |
(USD) |
via email in
1-10 business day
|
|
|
SY/T 10026-2001 |
Guide for calibrating the positioning assistant equipment of marine seismic acquisition |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6111-2007 |
Technical requirement for preparing of development plan adjustment for gas reservoir |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5587.14-2004 |
Codes for conventional workover job -- Part 14: Cementing plug and drilling out |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5724-2008 |
Design method of casing string strength |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6613-2005 |
Recommended practice on the rheology and hydraulics of oil-well drilling fluids |
(USD) |
via email in
1-5 business day
|
VALID
|
|
SY/T 6619-2005 |
Specification for the operation and quality control of neutron lifetime logging |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6334-1997 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|