Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6296-1997 |
|
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
JT/T 494-2003 |
Simulating test method for intake valve deposit of gasoline engine |
(USD) |
via email in
1-3 business day
|
|
|
SY/T 6691-2007 |
Specification for operatione plan of logging |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5274-2000 |
Resin-coated sand |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5579.3-2008 |
Reservoir description method—Part 3:Carbonate buried hill reservoir |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6393-1999 |
Specification for energy saving in crude oil pipeline design |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6332-2004 |
Trajectory control for directional well |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5404-2002 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
GB/T 14090-2008 |
Terminology for offshore oil and gas development engineering |
(USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 5815-1993 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5352-2007 |
Releasing drillable packers bridge plugs and setting tools |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6698-2007 |
Recommended practice for coiled tubing operations in oil and gas well services |
(USD) |
via email in
1-10 business day
|
VALID
|
|
SY/T 5587.4-2004 |
Codes for conventional workover job -- Part 4: Finding and sealing of casing leak for cased wells |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6397-1999 |
Evaluation procedure of drilling fluid biocides |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5416.1-2006 |
定向井测量仪器测量及检验 第1部分:无线随钻类 |
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6111-1994 |
|
(USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5956-2004 |
Technical regulations of drill etring abandonment |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 5725-1995 |
|
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6366-2005 |
The technical indexes of oil production and relative calculation methods |
(USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 10024-1998 |
Recommended practice for design installation repair and operation on subsurface safety valve system |
(USD) |
via email in
1-5 business day
|
VALID
|
|
|