Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6741-2016 |
The drafting rules for calibration method of measuring instrument for oil industry |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 0515-2014 |
Specification for oil and gas separators |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6904-2012 |
The calibration method of production well logging surface system |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY 4206-2007 |
Code for quality acceptance of oil and gas construction engineering |
1470 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
SY/T 6860-2012 |
Calibration method for master gauge of taper thread used in oil industry |
795 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 7079-2016 |
The calibration method of neutron calibrator |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 0538-2012 |
Specification for tubular heater |
1170 (USD) |
via email in
1-8 business day
|
VALID
|
|
SY/T 10048-2003 |
Recommended practice for evaluation of corroded pipelines |
870 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
SY/T 7075-2016 |
Calibration specification for the petroleum drilling/workover weight indicating system |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY/T 6679.2-2009 |
Calibration method of mud-logging unit—Part 2: Gas Chromatograph |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6411-1999 |
General requirements for detonating cord in oil and gas well |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 7082-2016 |
The calibration method of neutron tool |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
SY/T 5070-2002 |
Cutters for drilling and servicing |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY 4201.4-2007 |
Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 4:Boiler device |
390 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6640-2012 |
The calibration methodology of the down hole electronic pressure gauge |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
SY/T 6717-2008 |
Specification of internal coating for tubing and casing |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 6238.2-2002 |
Procedures of full scale test for oil country tubular goods Makeup/breakout tests for casing and tubing connections |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 7080-2016 |
Calibrating method for intrument of testing pumping unit |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
SY 4201.2-2007 |
Code for quality acceptance of oil and gas construction engineering Equipment installation engineering Part 2:Tower device |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
SY/T 5633-1999 |
Format for petroleum logging charts |
480 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|