This Part of SY 4201 specifies the quality criteria, contents and procedures of the acceptance of inspection lots and subitem projects of the boiler device installation engineering in equipment installation engineering; and it also specifies the quality management and control at construction site of the boiler device installation engineering in equipment installation engineering.
This Part is applicable to the construction quality acceptance of boiler device in equipment installation engineering of oil and gas construction engineering, including the installation of special skid-mounted steam injection boiler for oilfield and the installation of water jacket heater, firetube heater, (separating, heating and buffering) integral unit, vertical and horizontal cylindrical tubular heaters, and heat medium indirect heater.
The acceptance of the installation quality of micro-positive pressure heater may also referred to this Part.