Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 0086-2012 |
Electrical Isolation of Cathodically Protected Pipelines |
630 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6666-2012 |
Recommended Pracice on Application Care, and Use of Wire Rope for Petroleum & Natural Gas Industry Service |
600 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 6066-2012 |
The Method of Energy Consumption Test and Calculation for Crude Oil Pipeline Transport System |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6128-2012 |
Procedure for Evaluation Tests of Tubing and Casing Connection Properties |
480 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6899-2012 |
Determination of the Water Dew Point of Natural Gas-The Capacitance Method |
90 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6518-2012 |
Recommended Practice for Guarding of Pumping Units |
330 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6211-2012 |
Labor Quota for LVL & Uphole Survey |
120 (USD) |
via email in
1 business day
|
VALID
|
|
SY 6044-2012 |
The Requirements of Safety Emergency for Petroleum and Natural Gas Operations in Beach-shallow Sea |
90 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 7550-2012 |
Determination of Wax, Resins and Asphaltenes in Crude Oil |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5826-2012 |
Maintenance and Service Procedure for Hydraulic Piston Pump |
180 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY 6326-2012 |
The Specification for Grading and Evaluating the Loading Capacity on Derricks and Substructure of the Drilling Rig and Working Rig |
180 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6588-2012 |
Calibration Methods for Electric Log Tools |
360 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6917-2012 |
Petroleum and Natural Gas Industries--Drilling and Production Equipment--Marine Drilling Riser Couplings |
270 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5739-2012 |
Labor Quota of Power Transformer Equipment Maintenance |
690 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5507-2012 |
Labor Quota for Seismic Prospecting with Vibrator |
240 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6895-2012 |
Coiled Tubing |
810 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 0326-2012 |
Technical Standard of Glass Fibre Reinforced Plastic Lining of Epoxy Resin for Steel Tank |
510 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6545-2012 |
Specification for Calibration of the Pulsed Neutron Logging Tool |
150 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5415-2012 |
Use and Dull Grading System of Bits |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6918-2012 |
Petroleum and Natural Gas Industries--Drilling and Well Servicing Equipment--Mud-pump |
330 (USD) |
via email in
1 business day
|
VALID
|
|
|