Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6775-2010 |
Standard of Seabank Embankment Insprction (Rayleigh Wave Method) |
150 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6797-2010 |
Real-Time Measuring and Adjusting Instrument of Flooding Well's Layered Flux |
244 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6378-2010 |
Technology Method for Fishing and Tieback Casing of Oil and Injection Well |
210 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6801-2010 |
The Installation, Operation and Maintenance of Hydraulic Disk Brake for Drilling Rig |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6802-2010 |
The Expandable Tubular Assembly for Casing Patch in Oilfield |
270 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6793-2010 |
Code for Design of Oil and Gas Transportation Pipeline Hydraulic Protection |
1800 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 0442-2010 |
Technical Standard for Internal Fusion Bonded Epoxy Coating of Steel Pipe |
900 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5889-2010 |
Oxygen Scavenger Performance Evaluation Method |
224 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6784-2010 |
Standard of Corrosion Control for Steel Storage Tank |
1110 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6783-2010 |
Computer Virus Prevention and Management Standard of Petroleum Industry |
120 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6737.3-2010 |
General Technical Requirements of Downhole Instrument Series for Production Logging. Part 3: Engineering |
480 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6257-2010 |
Injection & Production Technology Project for Steam Huff & Puff |
120 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6799-2010 |
General Specifications for Against Lightning and Surge Protection of Petroleum Instruments and Electronic Equipments |
210 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6124-2010 |
Practice for Water Drainage and Gas Production by Gas Lift Technology |
304 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 5600-2010 |
The Technical Specifications for Operation of Petroleum Wireline Logging |
420 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5454-2010 |
Technical Specification of Vertical Seismic Profiling |
680 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5216-2010 |
Coring Tools |
344 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6791-2010 |
General Requirements and Testing Methods of Firing Head System of Oil and Gas Well |
180 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6451-2010 |
The Technical Specifications for Exploring Well Logging Data Processing and Interpreting |
270 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5518-2010 |
Survey Specification for Oil and Gas Wells Location |
284 (USD) |
via email in
1 business day
|
VALID
|
|
|