Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 5348-2012 |
Resistivity Meters for Drilling Fluids |
90 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6027-2012 |
Quantitative Analysis Method of Rock and Mineral by Electron Probe Microanalysis |
120 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6885-2012 |
Code for Design Protection Against Lightning of Oil-gas Field and Pipeline Engineering |
630 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6082-2010 |
Petroleum Seismic Drilling Rig Operation and Maintenance |
224 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6803-2010 |
Workover Rig on Offshore Petroleum Platform |
480 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 0544-2010 |
Specification of Internal Coating for Drill Pipe |
300 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY 4212-2010 |
Code for Quality Acceptance of Oil and Gas Construction Engineering. Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field |
1069 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6790-2010 |
The Specification for Cperation of Cased Hole Resistivity Logging |
90 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5643-2010 |
Recommended Practice for Care and Handling of Sucker Rods |
480 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6055-2010 |
Technical specification for petroleum gravity,magnetic,electric and geochemical exploration map |
264 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6788-2010 |
Evaluation Procedures of Environmental Protection for Water-soluble Oilfield Chemicals |
140 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6779-2010 |
Safety Regulations for Gas Gathering Station in High Hydrogen Sulfide Gas Field |
150 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5991-2010 |
Thread Protectors for Casing, Tubing, Line Pipe and Drill Pipe |
244 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5805-2010 |
Installation Work Ration for Power Transmission and Distribution |
680 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6455-2010 |
Safety Glossary of Petroleum Industry by In Land |
360 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5502-2010 |
The Work Load Conversion Method - A Geophysical Prospecting Industry Standard |
164 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 5676-2010 |
Technical Cinditions for High Pressure Forgings for Petroleum Drilling and Production Manchinery |
264 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 5532-2010 |
Drawworks for Drilling Rig |
324 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5965-2010 |
Geological Proposal Specification for Oil & Gas Exploration Wells |
404 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5504.7-2010 |
Evaluation Method for Well Cement Additives - Part 7: Weighting Material |
284 (USD) |
via email in
1 business day
|
VALID
|
|
|