Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
SY/T 6804-2010 |
Specification for Offshore Platform Drilling Rig System Layout |
270 (USD) |
via email in
1 business day
|
VALID
|
|
SY 6355-2010 |
Security Sign of Petroleum and Natural Gas Production |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5699-2010 |
Lift Sub |
184 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5251-2010 |
Contents and Basic Quality Requirements of Mud Logging Items of Oil & Gas Wells |
184 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
SY/T 6787-2010 |
Technical Requirements of Environmental Protection for Water-soluble Oilfield Chemicals |
120 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5362-2010 |
The Technical Specifications for Oil, Gas and Water Flow Rate Simulation Testing Tquipment in Production Logging |
184 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5819-2010 |
Technical Specification for Land Gravity Survey |
600 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 4084-2010 |
Technical Specification for Environmental Conditions and Loads in Shallow Wate |
1270 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 0556-2010 |
Technical Code for Quick Opening Closure |
464 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6800-2010 |
Multi-array Induction Imaging Logging Tool |
360 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5504.5-2010 |
Evaluation Method for Well Cement Additives - Part 5: Anti-gas Migration Agent |
480 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6569-2010 |
Economical Operation Specification for Water Injection System of Oil Field |
180 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 5912-2010 |
Analysis and Authenticates Method for Conodonts |
464 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5141-2010 |
Hydraulic Torque Converter With Centrifugal Turbine Used for Drilling Rig |
284 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6218-2010 |
Operation of Casing Section Mill and Whipstock |
120 (USD) |
via email in
1 business day
|
SUPERSEDED
|
|
SY/T 6234-2010 |
Determintion of Gross Heat Transfer Factor the Buried Pipeline |
240 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6472-2010 |
Method of Stipulation of Principal Energy Consumption Norm for Production of Oil Field |
150 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6798-2010 |
Petroleum Rock Pore Volume Compressibility Instruments |
180 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 5794-2010 |
Evaluation Method for Asphalt Products Used in Drilling Fluids |
244 (USD) |
via email in
1 business day
|
VALID
|
|
SY/T 6567-2010 |
Specification for Economical Operation of Natural Gas Transmission Pipeline System |
180 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
|