Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1394-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5153-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 634.5104-2009 |
Telecontrol equipment and systems Part 5-104 : Transmission protocols - network access for IEC 60870-5-101 using standard transport profiles |
780 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 5468-2013 |
Guidelines for working drawing estimate of transmission and transformer project |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 772-2001 |
Determination method of standard operation exchange capacity of ion exchange resin used in water treatment of thermal power plant |
135 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5294-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 802-2002 |
Cable ducts fabricated from fiberglass reinforced plastics |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 988-2005 |
Methods of measurement of power frequency eletric field and magnetic field from high voltage overhead power transmission line and substation |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5096-1999 |
Technical regulation for engineering geological boring of electrical power engineering |
825 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1261-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 523-2007 |
Practice Evaluation and Testing Method of Inhibitors for Chemical Cleaning |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5016-1999 |
Design specifications for concrete face rockfill dams |
540 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 541-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 606.3-1996 |
Guide for thermal energy balance of thermal power plant |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 708-1999 |
Type MG buried scraper feeder |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 509-1993 |
|
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 576-1995 |
Methods for collection of coal samples from truck |
90 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 660-1998 |
Test procedure for coal ash high-temperature viscosity characteristic |
240 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 588-1996 |
The determination of fouling index of water |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1123-2009 |
Configuration for work safety device of fossil fuel power enterprise |
1155 (USD) |
via email in
1-8 business day
|
VALID
|
|
|