Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5057-1996 |
design code for hydraulic concrete structures |
2730 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 884-2004 |
Power plant metallography inspection and assessment guideline |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 439-1991 |
|
495 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 575.3-1999 |
Ergonomic principles for the design of control centres Part 3 : Hand reach and zones of control |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 500-1992 |
|
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5045-1995 |
Technical specification for designing of ash slag damming of fossil fuel power plants |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 641-2005 |
Electric valve actuators for power plant |
270 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 671-1999 |
General specifications for microprocessor-based generator-transformer unit protection equipment |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5028.2-2015 |
Standard for drawing of electric power engineering Part 2:mechanical |
1890 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 613-1997 |
Specification and technical requirement for import AC gapless metal oxide surge arresters |
210 (USD) |
via email in
1-3 business day
|
|
|
DL/T 461-2004 |
Guide for operation and the maintenance of electrostatic precipitators for coal-fired power plants |
345 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5349-2006 |
Drawing standard for hydraulic machinery of hydropower and water conservancy project |
510 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 959-2005 |
Guide of safety valves for power station boilers |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5504-2015 |
Technical code for design of long span crossing of UHV overhead transmission line |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 934-2005 |
The rules for measuring and evaluating thermal insulation of thermal power plant |
300 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 604-2009 |
Technical specification of high-volatage shunt capacitor installations |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1115-2009 |
Guide for chemistry check-up of unit maintenance in fossil fuel power plant |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 631-1997 |
General specification for mimic board driver |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 548-1994 |
|
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5160-2015 |
|
915 (USD) |
via email in
1-8 business day
|
VALID
|
|
|