Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1018-2006 |
Capacitance jointmeter transducer |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 423-1991 |
|
45 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 440-2004 |
The code of inspection and evaluation for existing boiler drum in fossil-fuel power plants |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5068-1996 |
Technical code for designing chemistry of fossil fuel power plant |
1410 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 527-2002 |
Technical condition for power supply at static state protection equipment |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 586-1995 |
The technical guide of supervision for manufacturing equipment of electric power by user |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 973-2005 |
Verification regulation of digital high voltmeter |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 478-2001 |
General specifications for static protection, security and automatic equipment |
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 848.2-2004 |
General technical specification of high voltage test devices Part 2: Power frequency high voltage test device |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5128-2009 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5432-2009 |
Specifications of project management for hydropower and water resources engineering |
2580 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 665-2009 |
Inspection guide for water and steam integrated sampling and on-line analysing unit |
450 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 428-1991 |
|
210 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5175-2003 |
Technical rule for designing thermodynamic control system of fossil fuel power plants |
525 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/Z 790.11-2001 |
Distribution automation using distribution line carrier systems- Part 1: General considerations -Section 1: Distribution automation system architecture |
315 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 905-2004 |
Technical guide for repair welding of turbine blades |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 763-2001 |
Technical requirements for overhead line helical fittings |
315 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5097-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 629-1997 |
Separating filters of coupling devices for power line carrier systems |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 899-2004 |
Loading tests on tower and pole structures of overhead line |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|