Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 654-1998 |
The technical guide for the life assessment of overage units in fossil power plants |
525 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 502.7-2006 |
Analytical methods of steam and water in power plants Part 7: Determination of free carbon dioxide (Direct method) |
90 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 759-2009 |
Link Fittings |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 503-1992 |
|
15 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5201-2004 |
Design guide for construction planning of underground engineering of hydropower and water conservancy project |
675 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/Z 634.11-2005 |
Telecontrol equipment and systems-Part 1-1:General considerations-General principles |
270 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5013-1995 |
|
1800 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 1033.8-2006 |
Electric power standard thesaurus part.8 Electric power supply and Electricity consumption |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 1011-2006 |
Data exchange format for calculating setting of power system protection |
285 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 955-2005 |
Analysis of water and steam in fossil fuel power plant Determination of copper and iron by graphite furnace atomic absorption spectrophotometry |
120 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1309-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL 433-1992 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 5020-1993 |
Specifications on compiling feasibility study report of water conservancy and hydropower projects |
615 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 616-2006 |
maintenance & adjusting guide for the thermal power plant steam-water piping and support-hangers |
360 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 731-2000 |
Error calculator used in electrical energy meter calibrating |
180 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5706-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 659-2006 |
Code for acceptance test of distributed control system in fossil fuel power plant |
|
via email in
|
ABOLISHED
|
please email coc@codeofchina.com for quotation
|
DL/T 468-2004 |
Guide on type selection and application for power boiler fans |
855 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5166-2002 |
Design specification for river-bank spillway |
2730 (USD) |
via email in
1-10 business day
|
VALID
|
|
DL/T 903-2004 |
Technical guide for surfacing parts of coal pulverizer |
105 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|