Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 1381-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 441-2004 |
Supervision code for creep strain of steam pipe in high temperature and high pressure in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5135-2001 |
Specifications of excavation blasting for hydropower and water conservancy project |
1110 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 438-2009 |
The technical supervision codes for metal in fossil-fuel power plant |
510 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 780-2001 |
Specification for neutral-to-earth resistance in distribution system |
120 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 611-1996 |
Guide for 300MW grade boiler operation |
675 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
DL/T 1397.7-2014 |
General specification for DC power system test equipments of electric power system-Part 7: Battery monomer activation instrument |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 414-2004 |
Norm for environmental monitoring of thermal power plants |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 1076-2007 |
Guideline for the commissioning of chemistry systems in power plants |
405 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 846.3-2004 |
General technical specifications for high voltage test equipments Part 3: High voltage switch integrate detector |
180 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 521-2004 |
Guide for acceptance usage and maintenance of vacuum oil purifier |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5475-2013 |
Guidelines for item segregation of construction budget for garbage power generation project |
780 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 502.18-2006 |
Analytical methods of steam and water in power plants Part 18: Determination of hydrazine (Indirect method) |
105 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5330-2005 |
Code for mix design of hydraulic concrete |
930 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 5205-2005 |
Code of valuation with bill quantity of electric power construction works Transmission line works |
780 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 790.433-2005 |
Distribution automation using distribution line carrier system -- Part 4-33: Data communication protocols -- Data link layer -- Connection oriented protocol |
255 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 694-1999 |
The technical guide of ultrasonic inspection for high-temperature tight bolts |
165 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5120-2000 |
DC System design code for small electric power project |
1110 (USD) |
via email in
1-8 business day
|
|
|
DL/T 524-1993 |
|
195 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL 425.6-1991 |
|
75 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
|