Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add To Cart |
DL/T 5478-2013 |
|
|
via email in
1-3 business day
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 491-2008 |
Code for operating and overhauling of self-shung exciction system equipment of large and medium-sized hydraulic generator |
150 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 1319-2014 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 556-1994 |
Guide for vibration monitoring device setting of hydraulic turbine generator set |
374 (USD) |
via email in
1 business day
|
ABOLISHED
|
|
DL/T 748.5-2001 |
Guide of maintenance of boiler unit for thermal power station Part 5 : The maintenance of air & flue system |
240 (USD) |
via email in
1-3 business day
|
VALID
|
|
DLGJ 102-1991 |
|
375 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 828-2002 |
Technical reqirements for stocking single phase alternating current long life induction watt-hour meter |
330 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL 519-1993 |
Inspecting Standard on lon Exchange Resins for Water Treatment in Thermal Power Plants |
360 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 951-2005 |
Guide for the acceptance of reverse osmosis equipment for water treatment in fossil fuel power plant |
150 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5383-2007 |
Technical code of wind power plant design |
210 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 794-2001 |
Chemical cleaning guide for steam power plant |
900 (USD) |
via email in
1-8 business day
|
ABOLISHED
|
|
DL/T 1272-2013 |
|
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 939-2005 |
Guide for boiler tube monitoring and inspection in fossil fuel power plant |
135 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 620-1997 |
Overvoltage protection and insulation coordination for AC electrical installations |
810 (USD) |
via email in
1-8 business day
|
VALID
|
|
DL/T 757-2001 |
Strain clamp |
225 (USD) |
via email in
1-3 business day
|
ABOLISHED
|
|
DL/T 5399-2007 |
Design guide for vertical shiplift in hydropower and water resources projects |
|
via email in
|
VALID
|
please email coc@codeofchina.com for quotation
|
DL/T 5137-2001 |
Technical code for designing electrical measuring and energy metering device |
735 (USD) |
via email in
1-5 business day
|
VALID
|
|
DL/T 1043-2007 |
The vibrating steel wire jointmeter |
165 (USD) |
via email in
1-3 business day
|
VALID
|
|
DL/T 5074-1997 |
Technical code for investigation of geotechnical engineering of fossil fuel power plant |
2505 (USD) |
via email in
1-10 business day
|
ABOLISHED
|
|
DL/T 486-2000 |
Specifications for HV AC disconnectors and earthing switches |
705 (USD) |
via email in
1-5 business day
|
ABOLISHED
|
|
|